ClosedSuppliesEuropeanOnderhandeling zonder bekendmakingGreen

Salt electrolysis installation with membrane cell technology

Stichting SPURD · Onderhandeling zonder bekendmaking · 1 lots · 351607
Type
Supplies
42912300
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting SPURD is seeking a supplier for a new salt electrolysis installation with membrane cell technology to replace the current disinfection of the Leeghwaterbad in Purmerend. The contract includes the supply, installation, and maintenance of the system, whereby the swimming pool remains fully operational during the works and experiences no disruption. The supplier must comply with all Dutch safety and environmental standards, guarantee a reliable supply of parts, and offer a clear maintenance and service plan. The installation is expected to provide a sustainable, energy-efficient, and cost-effective solution, with minimal impact on the use of the swimming pool. The procurement follows a negotiated procedure without public announcement, aimed at selecting a specialist with experience in similar projects within the water and chemical sectors.

Supplies · Onderhandeling zonder bekendmaking · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Supplies
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 42SuppliesEU tenderGreen / SPPsalt electrolysismembrane cellswimming pool disinfection

01What is being requested

Stichting SPURD is seeking a supplier for a new salt electrolysis installation with membrane cell technology to replace the current disinfection of the Leeghwaterbad in Purmerend. The contract includes the supply, installation, and maintenance of the system, whereby the swimming pool remains fully operational during the works and experiences no disruption. The supplier must comply with all Dutch safety and environmental standards, guarantee a reliable supply of parts, and offer a clear maintenance and service plan. The installation is expected to provide a sustainable, energy-efficient, and cost-effective solution, with minimal impact on the use of the swimming pool. The procurement follows a negotiated procedure without public announcement, aimed at selecting a specialist with experience in similar projects within the water and chemical sectors.

The contract concerns the supply, installation, and maintenance of a new salt electrolysis installation to replace the existing disinfection of the Leeghwaterbad swimming pool in Purmerend. During execution, the swimming pool remains in use and experiences no disruption from the conversion.

42912300Supplies
1Salt electrolysis installation with membrane cell technology

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Sulzer Pumps Wastewater Netherlands B.V.SME9562×
2Xylem Water Solutions Nederland B.V.SME68
3Distrimex Pompen & Service B.V.SME67
4VDH Water TechnologyUnknown67
5Kurstjens B.V.SME63
6Veolia Water Technologies & Solutions Netherlands B.V.SME60

05Legal themes that may be relevant here

06Frequently asked questions

What is the exact scope of the contract for the salt electrolysis installation?
The contract includes the supply, installation, and maintenance of a new salt electrolysis installation with membrane cell technology to replace the current disinfection of the Leeghwaterbad in Purmerend.
What impact will the installation of the new system have on the use of the swimming pool?
During the execution of the conversion, the Leeghwaterbad swimming pool remains fully operational and the swimming pool experiences no disruption from the works.
What is expected of the delivered solution regarding sustainability?
The installation is expected to provide a sustainable, energy-efficient, and cost-effective solution with minimal impact on the use of the swimming pool.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 300K
median
€ 800K
p75
€ 4,0 mln
deze opdracht

Gegunde waarden in CPV 42 · leveringen n=273