Yukonhaven Jetty 4
Havenbedrijf Rotterdam NV (HbR) intends to develop a new berth on the opposite side of jetty 3, named jetty 4, with the possibility of expansion to jetty 5 and 6. The tender concerns the design and realization of nautical infrastructure: a jetty of approx. 160 m for ocean-going vessels and inland shipping with a depth of approx. NAP -10 m, which may be deepened to NAP -13 m in the future; a retaining structure (combiwall) of approx. 200 m on the north side of Yukonhaven; various mooring posts, walkways, and a revetment of approx. 145 m; and dredging works and coastal and shore works to expand the port (approx. 450,000 m³). The scope excludes jetty 6, but a part of jetty 5 will be further specified during the award phase. The procedure is a competitive procedure with negotiation.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
Havenbedrijf Rotterdam NV (HbR) intends to develop a new berth on the opposite side of jetty 3, named jetty 4, with the possibility of expansion to jetty 5 and 6. The tender concerns the design and realization of nautical infrastructure: a jetty of approx. 160 m for ocean-going vessels and inland shipping with a depth of approx. NAP -10 m, which may be deepened to NAP -13 m in the future; a retaining structure (combiwall) of approx. 200 m on the north side of Yukonhaven; various mooring posts, walkways, and a revetment of approx. 145 m; and dredging works and coastal and shore works to expand the port (approx. 450,000 m³). The scope excludes jetty 6, but a part of jetty 5 will be further specified during the award phase. The procedure is a competitive procedure with negotiation.
HbR intends to develop a berth on the opposite side of jetty 3, jetty 4. The newly to be constructed mooring facilities must be expandable to jetty 5 and 6, so that the possible nautical space is utilized to the maximum. A part of jetty 5, yet to be determined, will be included in the scope of this project. This will be further specified in the Tender Guidelines during the award phase. Jetty 6 is not part of the scope. It involves the design and realization of nautical infrastructure, which primarily concerns: - A jetty with a length of approx. 160 m for ocean-going vessels and inland shippi
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the exact scope of the works for Yukonhaven Jetty 4?
To what extent are the future expansions to jetty 5 and 6 included?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159