Brabant Water N.V. intends to expand the WPB in Wouw to 7.5 million m³/year. A new main building is planned; the procurement is non-public.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Brabant Water N.V. intends to expand the WPB in Wouw to 7.5 million m³/year. A new main building is planned; the procurement is non-public.

To meet future water demand in the distribution area of Wouw (West-Brabant), Brabant Water will expand the water production plant (WPB) Wouw. This additional production capacity will be realized through the complete new construction of a main building (aeration, softening filtration, and pumps). Production will increase from 4.0 to 7.5 million m³ of drinking water per year.

45000000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME10065×
2KWS Infra B.V.SME9592×
3Boskalis Nederland B.V.SME9569×
4Van Gelder BVSME9553×
5Den Ouden Aannemingsbedrijf B.V.SME9523×
6BAM Bouw en Techniek bvSME9434×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the expansion of the water production plant Wouw?
The expansion is necessary to meet the future water demand in the distribution area of Wouw (West-Brabant).
What does the planned new construction entail for the production capacity?
The production capacity of the water production plant will increase from 4.0 to 7.5 million m³ of drinking water per year through the complete new construction of a main building for aeration, softening filtration, and pumps.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159