ClosedWorksEuropeanRestrictedGreen

WPB Lith Activated Carbon Filtration and Extraction (AKW)

Brabant Water NV · Restricted · 1 lots · 356643
Type
Works
45200000
Estimated value
€ 6,50M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Brabant Water NV intends to expand its water production facility in Lith with a new anaerobic activated carbon filtration system and a complete renovation of the water extraction wells. The project will be executed as a traditional 2-phase construction team: first a construction team phase in which the contracting authority and construction partner jointly develop a preliminary, final, and technical design, specifications, and budget; followed by a UAV phase for execution. The construction team phase requires an open budget, continuous evaluation, and room for innovative, sustainable solutions. The total target budget is between €5 million and €10 million, including the construction and realization phases, excluding risk and unforeseen costs. The bidder must offer a market-conform weighted hourly rate and maintain control over scope and costs from the outset. The assignment focuses on the robustness, efficiency, and future-proofing of the water production facility.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€6,500,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPactivated carbon filtrationConstruction Teamopen budget

01What is being requested

Brabant Water NV intends to expand its water production facility in Lith with a new anaerobic activated carbon filtration system and a complete renovation of the water extraction wells. The project will be executed as a traditional 2-phase construction team: first a construction team phase in which the contracting authority and construction partner jointly develop a preliminary, final, and technical design, specifications, and budget; followed by a UAV phase for execution. The construction team phase requires an open budget, continuous evaluation, and room for innovative, sustainable solutions. The total target budget is between €5 million and €10 million, including the construction and realization phases, excluding risk and unforeseen costs. The bidder must offer a market-conform weighted hourly rate and maintain control over scope and costs from the outset. The assignment focuses on the robustness, efficiency, and future-proofing of the water production facility.

Project Description: Brabant Water intends to expand its water production facility in Lith with a new process step: anaerobic activated carbon filtration, in a new architectural building. Additionally, the water extraction well field will be renovated, expanded, and redesigned. The eight existing water extraction cellars will be completely renewed, including the installations. Two new water extraction wells and an extraction switch building will also be added. Site cables, underground pipelines with appendages, the source path, and paving will be renewed and/or adjusted according to the new d

45200000€ 6,50MWorks
1WPB Lith Activated Carbon Filtration and Extraction (AKW)€6,500,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€6,500,000

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9965×
2Dura Vermeer Infra Regionale Projecten BVSME9858×
3ENGIE Infra & Mobility B.V.SME9769×
4Van Gelder BVSME9753×
5Croonwolter&dros B.V.SME9425×
6Boskalis Nederland B.V.SME9369×

05Legal themes that may be relevant here

06Frequently asked questions

What does the construction team project approach entail?
The project is executed as a 2-phase construction team project. In the first phase, the contracting authority and the construction partner work together on the preliminary, final, and technical design, the specifications, and the budget. After this phase, a tender for the follow-up process follows according to a traditional UAV-2012 specification.
What is the scope and content of the target budget?
The target budget is between €5,000,000 and €10,000,000. This budget includes the costs for the Construction Team phase, the realization phase, commissioning, and internal delivery, but excludes the project risk budget and unforeseen costs.
On which aspects can a construction partner introduce innovation?
There is room for innovative ideas in the field of sustainability (such as energy savings and material use), design, safety, improving the use and maintenance of installations, and methods for quality, standardization, and cost-effectiveness.
What are the main works within the project?
The works include the expansion of the water production facility with a new anaerobic activated carbon filtration in a new building, the renovation and expansion of the water extraction well field, the renewal of eight water extraction cellars and installations, and the realization of two new water extraction wells and an extraction switch building.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 6,5 mln

Gegunde waarden in CPV 45 · werken n=3159