AwardedWorksSME-friendlyOpen

Residential preparation of chamber 6 & 7 Steenenburg

Gemeente Heusden · Open · 2 lots · 371186
Type
Works
45222000
Estimated value
€ 976K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project concerns the residential preparation of Chamber 6 and 7 at Landgoed Steenenburg by the Municipality of Heusden, including various demolition and preparatory civil engineering works.

Works · Open · National procedure · SME-friendly

SME-friendly
Contracting authority
Contract type
Works
Open
Estimated value
€976,000
awarded value
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
2
2 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendly

01What is being requested

The residential preparation of Chamber 6 and 7 at Landgoed Steenenburg, comprising various civil engineering works such as the removal of paving, pipelines, and greenery.

Residential preparation of chamber 6 and 7 at Landgoed Steenenburg within the Municipality of Heusden

45222000Works
1Lot 1 - Chamber 6 within Landgoed Steenenburg
2Lot 2 - Chamber 7 within Landgoed Steenenburg

02Outcome

Awarded

Aann.- Wegenbouw van Rosmalen B.V.

Award value
€976,000
Bidders
5

03Breakdown by lot

Lot 1 - Chamber 6 within Landgoed Steenenburgn/a
Lot 2 - Chamber 7 within Landgoed Steenenburgn/a

Per-lot values not published — bars show only the lot breakdown.

04Strategic insight

Strategic insight · AI analysis
Ensure precise coordination of the inspection plan with the contracting authority to prevent delays in the application of paving. Take into account the strict quality requirements for the sewer inspection, where a maximum of 10% of the segments may contain erroneous observations. Ensure that the tree zones are correctly defined in accordance with the crown projection plus 1.5 meters.
Read automatically from the tender documents using AI. Always verify against the original documents.

05Points of attention

Important · 7
The inspection plan must be approved in writing prior to the works.Important
No paving may be applied before the inspection has been approved.Important
The contractor is responsible for the accessibility of the sewerage for the inspection company.Important
The sewer cleaning must be carried out timely and correctly prior to the inspection.Important
A tree protection plan must be submitted for approval at least 2 weeks prior to the works.Important
The work plan for the tree zones must be drawn up by an ETT'er.Important
The image quality during the camera inspection must be visually assessed, and if quality is insufficient, measures must be taken.Important

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Bidders in this segment

#Likely bidderFitWins
1Van Gelder BVSME9653×
2KWS Infra B.V.SME9592×
3Boskalis Nederland B.V.SME9469×
4Dura Vermeer Infra Regionale Projecten BVSME9458×
5BAM Infra B.V.SME9377×
6Combinatie Heijmans - SWARCOUnknown9373×

08Tender documents

TN513938 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250714154626pdfJul 14, 2025 · 9 KB
250409 Steenenburg kamer 6 Perceel 1 NVIpdfApr 9, 2025 · 86 KB
250409 Inschrijfstaat kamer 7 Perceel 2pdfApr 9, 2025 · 148 KB
250409 Steenenburg kamer 7 Perceel 2 NVInsxApr 9, 2025 · 9 KB
250409 Steenenburg kamer 6 Perceel 1 NVInsxApr 9, 2025 · 20 KB
250409 Inschrijfstaat kamer 6 Perceel 1pdfApr 9, 2025 · 201 KB
250409 Steenenburg kamer 7 Perceel 2 NVIpdfApr 9, 2025 · 71 KB
10 Plan van aanpak omgang daspdfMar 17, 2025 · 5171 KB
04 Rapportage Bodem- en asbestonderzoekpdfMar 17, 2025 · 21121 KB
01 - Opruimwerkzaamheden kamer 7 - C (blad 01 van 03)pdfMar 17, 2025 · 588 KB
250314 Steenenburg kamer 6 Perceel 1 DEFrsxMar 17, 2025 · 1205 KB
06 Bomenposter Werken rond bomenpdfMar 17, 2025 · 1179 KB

09Legal themes that may be relevant here

10Frequently asked questions

Which rules apply to the settlement of quantities under the result obligation?
Deviations in the result obligation are settled in accordance with the UAV 2012. A distinction is made between settleable quantities (indicated with a 'V') and non-settleable quantities (indicated with an 'N').
What is meant by a 'quantity to be approved' in this project?
These are quantities that can be accurately determined by the contractor based on the specifications, the associated documents, and any additional data from the contracting authority, after which these are established in consultation.
Which works fall under the commencement works for lot 1?
The commencement works include provisions such as barriers on single-lane roads, bicycle and footpaths, the creation of traffic signs, diversion routes, temporary provisions, plates or boards for pedestrians, and dewatering.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,8 mln

Gegunde waarden in CPV 45 · werken n=3159