ClosedServicesEuropeanRestrictedGreen

WML Maintenance Grounds South 2025

Type
Services
77314000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

WML Maintenance Grounds South 2025 is a non-public procurement for the maintenance and management of approximately thirty industrial and nature sites in Central and South Limburg. The assignment focuses on creating and maintaining physical site conditions that support sustainable water extraction, in accordance with the Drinking Water Act 2011. Suppliers must have experience in grounds maintenance, water protection, and environmental management, and be capable of drafting an integrated maintenance plan that meets WML's requirements for water quality, soil integrity, and nature conservation. The service includes, among other things, infrastructure maintenance, monitoring of water and soil parameters, performing restorative and preventive works, and reporting to WML. The procedure is non-public, meaning a limited number of pre-selected bidders will be approached. The assignment requires a high level of expertise in water and environmental engineering, knowledge of local laws and regulations, and a proven track record in similar projects.

Services · Restricted · European procedure

Sustainability countsEuropean
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 77ServicesEU tenderGreen / SPPwater extractiongroundwater protectiongrounds management

01What is being requested

WML Maintenance Grounds South 2025 is a non-public procurement for the maintenance and management of approximately thirty industrial and nature sites in Central and South Limburg. The assignment focuses on creating and maintaining physical site conditions that support sustainable water extraction, in accordance with the Drinking Water Act 2011. Suppliers must have experience in grounds maintenance, water protection, and environmental management, and be capable of drafting an integrated maintenance plan that meets WML's requirements for water quality, soil integrity, and nature conservation. The service includes, among other things, infrastructure maintenance, monitoring of water and soil parameters, performing restorative and preventive works, and reporting to WML. The procedure is non-public, meaning a limited number of pre-selected bidders will be approached. The assignment requires a high level of expertise in water and environmental engineering, knowledge of local laws and regulations, and a proven track record in similar projects.

WML is responsible for sustainably securing the public drinking water supply in Limburg (Drinking Water Act, 2011). An important task arising from this is the protection of the groundwater sources required for water extraction. To this end, WML manages approximately thirty industrial, water extraction, and nature sites in Central and South Limburg. The management of these sites is aimed at creating and maintaining such physical site conditions and facilities that water extraction can take place sustainably in a technical sense and can be expanded.

77314000Services

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Donker Groep B.V.SME9687×
2Pennings Groenvoorziening BVSME9628×
3Holstein B.V.SME9317×
4Aannemersbedrijf M.J. Smits B.V.SME9321×
5Verhart Groen B.V.SME9320×
6Van Doorn Geldermalsen B.V.SME9126×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the assignment for the sites in Central and South Limburg?
The assignment focuses on creating and maintaining physical site conditions and facilities that support and enable sustainable water extraction.
What does the management of the thirty industrial, water extraction, and nature sites entail?
The management is aimed at ensuring the physical conditions necessary for sustainable water extraction in a technical sense, in accordance with the Drinking Water Act 2011.
Which sustainability criteria apply to this assignment?
Sustainability criteria apply to this assignment for the maintenance of the sites.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 260K
median
€ 600K
p75
€ 1,8 mln
deze opdracht

Gegunde waarden in CPV 77 · diensten n=1648