WML Maintenance Grounds South 2025
WML Maintenance Grounds South 2025 is a non-public procurement for the maintenance and management of approximately thirty industrial and nature sites in Central and South Limburg. The assignment focuses on creating and maintaining physical site conditions that support sustainable water extraction, in accordance with the Drinking Water Act 2011. Suppliers must have experience in grounds maintenance, water protection, and environmental management, and be capable of drafting an integrated maintenance plan that meets WML's requirements for water quality, soil integrity, and nature conservation. The service includes, among other things, infrastructure maintenance, monitoring of water and soil parameters, performing restorative and preventive works, and reporting to WML. The procedure is non-public, meaning a limited number of pre-selected bidders will be approached. The assignment requires a high level of expertise in water and environmental engineering, knowledge of local laws and regulations, and a proven track record in similar projects.
Services · Restricted · European procedure
01What is being requested
WML Maintenance Grounds South 2025 is a non-public procurement for the maintenance and management of approximately thirty industrial and nature sites in Central and South Limburg. The assignment focuses on creating and maintaining physical site conditions that support sustainable water extraction, in accordance with the Drinking Water Act 2011. Suppliers must have experience in grounds maintenance, water protection, and environmental management, and be capable of drafting an integrated maintenance plan that meets WML's requirements for water quality, soil integrity, and nature conservation. The service includes, among other things, infrastructure maintenance, monitoring of water and soil parameters, performing restorative and preventive works, and reporting to WML. The procedure is non-public, meaning a limited number of pre-selected bidders will be approached. The assignment requires a high level of expertise in water and environmental engineering, knowledge of local laws and regulations, and a proven track record in similar projects.
WML is responsible for sustainably securing the public drinking water supply in Limburg (Drinking Water Act, 2011). An important task arising from this is the protection of the groundwater sources required for water extraction. To this end, WML manages approximately thirty industrial, water extraction, and nature sites in Central and South Limburg. The management of these sites is aimed at creating and maintaining such physical site conditions and facilities that water extraction can take place sustainably in a technical sense and can be expanded.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of the assignment for the sites in Central and South Limburg?
What does the management of the thirty industrial, water extraction, and nature sites entail?
Which sustainability criteria apply to this assignment?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 260K
€ 600K
€ 1,8 mln
Gegunde waarden in CPV 77 · diensten n=1648