Componistenbuurt District Heating Network Project Partner Distribution for the construction of a district heating network and the connection of homes

Gemeente Zutphen · Restricted · 330555
Type
Works
45230000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Zutphen is working with partners to realize the Componistenbuurt heat project. The project focuses on setting up a district heating network that is fed via a heat pump from the IJssel. The network must provide heat to more than 700 apartment and ground-bound homes. Approximately 75% of the homes are owned by Woonbedrijf ieder1, the rest are privately owned. In addition, six utility buildings will be connected. The assignment concerns the construction of the network and the connection of the homes. The procedure is non-public and the CPV code is not specified. The contracting authority is the Municipality of Zutphen. The works include, among other things, the design, the laying of pipes, the installation of the heat pump, and the connection of homes and utility buildings. The collaboration with the local energy cooperative Zutphen Energie, Firan, Woonbedrijf ieder1, and Rijkswaterstaat emphasizes the integration of public and private partners. The tender focuses on parties with experience in district heating and large-scale infrastructure projects.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderdistrict heating networkheat pumpdistrict heating

01What is being requested

The Municipality of Zutphen is working with partners to realize the Componistenbuurt heat project. The project focuses on setting up a district heating network that is fed via a heat pump from the IJssel. The network must provide heat to more than 700 apartment and ground-bound homes. Approximately 75% of the homes are owned by Woonbedrijf ieder1, the rest are privately owned. In addition, six utility buildings will be connected. The assignment concerns the construction of the network and the connection of the homes. The procedure is non-public and the CPV code is not specified. The contracting authority is the Municipality of Zutphen. The works include, among other things, the design, the laying of pipes, the installation of the heat pump, and the connection of homes and utility buildings. The collaboration with the local energy cooperative Zutphen Energie, Firan, Woonbedrijf ieder1, and Rijkswaterstaat emphasizes the integration of public and private partners. The tender focuses on parties with experience in district heating and large-scale infrastructure projects.

The Municipality of Zutphen, in collaboration with its chain partners the local energy cooperative Zutphen Energie (ZE), Firan, Woonbedrijf ieder1, and Rijkswaterstaat, is developing the Componistenbuurt heat project. In this project, the IJssel is the main source for a heat pump in the neighborhood. The heat pump feeds an MT district heating network that will provide heat to over 700 apartment and ground-bound homes. Approximately 75% of the homes are owned by Woonbedrijf ieder1 – the remainder is private property. Six smaller utility buildings will also be connected.

45230000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9465×
2KWS Infra B.V.SME9292×
3NTP B.V.SME8522×
4SPIE Nederland B.V.SME8523×
5ENGIE Infra & Mobility B.V.SME8469×
6BAM Bouw en Techniek bvSME8434×

05Legal themes that may be relevant here

06Frequently asked questions

What is the goal of the Componistenbuurt heat project?
The project involves the development of a district heating network in which the IJssel serves as the main source for a heat pump in the neighborhood. This network must provide heat to over 700 apartment and ground-bound homes.
Which homes and buildings will be connected to the district heating network?
The MT district heating network provides heat to over 700 apartment and ground-bound homes. Approximately 75% of these homes are owned by Woonbedrijf ieder1, the remainder is privately owned. In addition, six smaller utility buildings will be connected.
With which partners is the heat project being developed?
The Municipality of Zutphen is developing the project in collaboration with the local energy cooperative Zutphen Energie (ZE), Firan, Woonbedrijf ieder1, and Rijkswaterstaat.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159