Prior notice Demolition and new construction of various buildings Woensdrecht airbase

Rijksvastgoedbedrijf · Open · 1 lots · 305027
Type
Works
45110000
Estimated value
€ 68M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the demolition and new construction of various buildings at Vliegbasis Woensdrecht. The demolition includes the complete removal of buildings 382, 383, 384 (approx. 13,000 m²) and bicycle storage facilities 339, 661, 684 down to the foundation, as well as partial demolition of building 485 (3 floors, approx. 1,200 m² down to the foundation and 1,650 m² down to the load-bearing structure). The new construction focuses on the realization of building 704 (T&MO) with a built area of approx. 8,450 m², including the demolition of nearby buildings 103, 127 and 386 (Trafo 4). The existing structure of building 485 will be integrated into the new building. Additionally, the project includes the new construction of two storage and parking spaces, civil engineering works and landscaping. The contract is public and aimed at a full redevelopment of the site, involving both large-scale demolition and construction activities.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€68,000,000
estimated value
Submission deadline
Ongoing
15:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Den Haag
CharacteristicsCPV 45WorksEU tenderGreen / SPPdemolitionnew constructionairbase

01What is being requested

The tender concerns the demolition and new construction of various buildings at Vliegbasis Woensdrecht. The demolition includes the complete removal of buildings 382, 383, 384 (approx. 13,000 m²) and bicycle storage facilities 339, 661, 684 down to the foundation, as well as partial demolition of building 485 (3 floors, approx. 1,200 m² down to the foundation and 1,650 m² down to the load-bearing structure). The new construction focuses on the realization of building 704 (T&MO) with a built area of approx. 8,450 m², including the demolition of nearby buildings 103, 127 and 386 (Trafo 4). The existing structure of building 485 will be integrated into the new building. Additionally, the project includes the new construction of two storage and parking spaces, civil engineering works and landscaping. The contract is public and aimed at a full redevelopment of the site, involving both large-scale demolition and construction activities.

DEMOLITION The complete demolition of buildings 382, 383 and 384 (approx. 13,000 m² floor area) down to the foundation, as well as bicycle storage facilities 339, 661 and 684 down to the foundation. A portion of building 485 will be completely demolished down to the foundation (3 floors approx. 1,200 m² floor area) and a portion only down to the load-bearing structure (3 floors approx. 1,650 m² floor area). NEW CONSTRUCTION New construction T&MO (building 704) at Vliegbasis Woensdrecht (approx. 8,450 m² built area), including the demolition of existing, nearby buildings (building 103, 127

45110000€ 68MWorks
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€68,000,000

04Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9877×
2Combinatie Heijmans - SWARCOUnknown9773×
3KWS Infra B.V.SME9692×
4BAM Bouw en Techniek bvSME9534×
5Boskalis Nederland B.V.SME9470×
6Heijmans Infra B.V.SME9365×

05Legal themes that may be relevant here

06Frequently asked questions

What does the demolition work within this project include?
The demolition includes the complete removal of buildings 382, 383 and 384 (approx. 13,000 m²) and the bicycle storage facilities 339, 661 and 684 down to the foundation. Additionally, partial demolition will take place of building 485: a part down to the foundation (approx. 1,200 m²) and a part down to the load-bearing structure (approx. 1,650 m²).
Which new construction activities are part of the assignment?
The assignment includes the new construction of building 704 (T&MO) with a built area of approx. 8,450 m², whereby the existing structure of building 485 is integrated. Furthermore, two storage and parking spaces will be realized, including civil engineering works and landscaping.
Which buildings must be demolished for the new construction of building 704?
For the realization of the new construction of building 704 (T&MO), the nearby buildings 103, 127 and 386 (Trafo 4) must be demolished.
Are there specific criteria regarding sustainability?
Yes, sustainability criteria apply to this assignment.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 68 mln

Gegunde waarden in CPV 45 · werken n=3159