ClosedWorksEuropean

Prior Information Notice KRW Water Chain Task

Waterschap Vechtstromen · 1 lots · 329703
Type
Works
45000000
Estimated value
€ 12K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

In May 2024, Waterschap Vechtstromen plans to launch a European open procedure for the KRW Water Chain Task, aimed at reducing nitrogen and phosphorus levels at eight WWTPs. The contract will be divided into two lots: Lot 1 (Enschede, Hengelo, Goor & Oldenzaal) involving larger process optimization and sand filtration tasks; Lot 2 (Denekamp, Glanerbrug, Haaksbergen, Nijverdal) involving smaller optimizations and cloth filters. Each project will be executed integrally by a single contractor, with three bidders for Lot 1 and four for Lot 2, to provide opportunities for SMEs. The emphasis is on quality; award criteria will be identical for both lots. The procedure includes a preliminary design (VO) per location, followed by a construction team phase in which market parties review the final design (DO). The construction teams are scheduled to start in Q4 2024, with completion by 1 January 2028. The exact scope per location will only be determined at the time of award, but works are required at all eight locations.

Works · European procedure

European
Contracting authority
Contract type
Works
Estimated value
€12,345
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderKRWWater Chainnitrogen

01What is being requested

In May 2024, Waterschap Vechtstromen plans to launch a European open procedure for the KRW Water Chain Task, aimed at reducing nitrogen and phosphorus levels at eight WWTPs. The contract will be divided into two lots: Lot 1 (Enschede, Hengelo, Goor & Oldenzaal) involving larger process optimization and sand filtration tasks; Lot 2 (Denekamp, Glanerbrug, Haaksbergen, Nijverdal) involving smaller optimizations and cloth filters. Each project will be executed integrally by a single contractor, with three bidders for Lot 1 and four for Lot 2, to provide opportunities for SMEs. The emphasis is on quality; award criteria will be identical for both lots. The procedure includes a preliminary design (VO) per location, followed by a construction team phase in which market parties review the final design (DO). The construction teams are scheduled to start in Q4 2024, with completion by 1 January 2028. The exact scope per location will only be determined at the time of award, but works are required at all eight locations.

Introduction/nWaterschap Vechtstromen intends to start the tender for the KRW Water Chain Task in May 2024. The purpose of this prior information notice is to inform interested market parties about the approach to this task, the procurement planning, and the expected scale so that market parties can prepare for the tender in view of the current schedule./n/nProject description/For the KRW Water Chain Task, Waterschap Vechtstromen aims to address 8 sewage treatment plants, hereinafter referred to as locations, in such a way that nitrogen and phosphorus levels are reduced within the framework of

45000000€ 12KWorks
1Prior Information Notice KRW Water Chain Task€12,345

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€12,345

04Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9958×
2Heijmans Infra B.V.SME9965×
3Van Oord Nederland BVSME9919×
4Croonwolter&dros B.V.SME9825×
5Ploegam B.V.SME9822×
6Van Doorn Geldermalsen B.V.SME9315×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the KRW Water Chain Task?
The objective is to reduce nitrogen and phosphorus levels at eight sewage treatment plants within the framework of the European Water Framework Directive (KRW).
What is the expected schedule for the execution of the works?
The first construction teams are expected to start in the fourth quarter of 2024, with the aim of completing the entire task by 1 January 2028.
How is the cooperation between the contracting authority and the contractors structured?
The contracting authority prepares a preliminary design (VO) per location. Market parties are then given a reviewing role during a construction team phase when drafting the final design (DO).
What is the intended approach regarding the execution per location?
The starting principle is that each location is executed integrally by one of the contractors.
What is the expected scope of the works per location?
The exact scope per location will only be determined at the time of award, but it is expected that works must be carried out at all eight locations.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 12K

Gegunde waarden in CPV 45 · werken n=3159