In phase 1 of a sustainability project, Universiteit Maastricht (UM) intends to replace approximately 12,000 conventional luminaires with LED lighting in four of its 40 buildings (TS 53, Bou 1-3, UNS 40, LEN14-MBB8-SSK39-TAPB-TAPX-GL17). The works must take place in 2023-2024 to remain within budgetary frameworks. The contract is an open procedure for works, whereby UM intends to execute phases 2 and 3 at a later stage. The tender requires a detailed technical specification, energy efficiency certificates, delivery and installation times, and a maintenance plan. Suppliers must demonstrate experience with large-scale LED installations in public buildings, comply with Dutch safety and environmental standards, and offer a competitive price-quality ratio.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Maastricht
CharacteristicsCPV 45WorksEU tenderLEDlightinguniversity

01What is being requested

In phase 1 of a sustainability project, Universiteit Maastricht (UM) intends to replace approximately 12,000 conventional luminaires with LED lighting in four of its 40 buildings (TS 53, Bou 1-3, UNS 40, LEN14-MBB8-SSK39-TAPB-TAPX-GL17). The works must take place in 2023-2024 to remain within budgetary frameworks. The contract is an open procedure for works, whereby UM intends to execute phases 2 and 3 at a later stage. The tender requires a detailed technical specification, energy efficiency certificates, delivery and installation times, and a maintenance plan. Suppliers must demonstrate experience with large-scale LED installations in public buildings, comply with Dutch safety and environmental standards, and offer a competitive price-quality ratio.

UM manages and maintains approximately 40 buildings in the municipality. These are eligible for sustainability through LED lighting and/or a new installation. This contract concerns a number of buildings (phase 1):나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과 같습니다:나중에서부터는 다음과

45310000Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Heijmans Infra B.V.SME9565×
2Combinatie Heijmans - SWARCOUnknown9473×
3BAM Bouw en Techniek bvSME9434×
4SPIE Nederland B.V.SME8923×
5Croonwolter&dros B.V.SME8925×
6Heijmans Utiliteit B.V.SME8927×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the works in phase 1?
In phase 1 of the sustainability project, approximately 12,000 conventional luminaires will be replaced with LED lighting.
Which specific buildings does the first phase of the contract focus on?
The works in phase 1 concern the buildings TS 53 (Specification 1), Bou 1-3 (Specification 2), UNS 40 (Specification 3) and LEN14-MBB8-SSK39-TAPB-TAPX-GL17 (Specification 4).
During which period must the works be carried out?
The replacement of the luminaires will take place in the period 2023-2024.
Are there plans for subsequent phases after the first phase?
In addition to the current contract, the contracting authority intends to execute phase 2 and phase 3 of the sustainability project.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159