Replacement of slag removal systems Line 5 HVC Dordrecht
HVC Dordrecht plans to replace the slag removal systems on Line 5 of the Waste-to-Energy plant. The assignment includes engineering, design, supply, installation, and commissioning of new installations, where the execution is closely linked to a planned line stop in September 2027. This is a prior information notice for a multiple selective procedure.
Works · Andere procedure in meerdere fasen · European procedure
01What is being requested
HVC Dordrecht plans to replace the slag removal systems on Line 5 of the Waste-to-Energy plant. The assignment includes engineering, design, supply, installation, and commissioning of new installations, where the execution is closely linked to a planned line stop in September 2027. This is a prior information notice for a multiple selective procedure.
Dear reader, HVC intends to start a multiple selective procedure with prior publication for the replacement of slag removal systems on Line 5 of the Waste-to-Energy plant HVC Dordrecht. Project description The current wet slag removal installation of Line 5 has reached the end of its technical and economic lifespan and is no longer overhaul-able. To ensure the continuity, safety, and availability of the installation, HVC intends to replace this installation. Scope of the assignment The assignment concerns works and includes in broad terms: *engineering and design; *supply of two new slag rem
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the exact scope of the assignment?
What experience is expected from the contractor?
On which criteria will the assignment be awarded?
What is the most important planning requirement for execution?
How can interested parties express their interest?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159