Replacement and sustainability of lighting
Stichting Regionaal Opleidingen Centrum Aventus is inviting an open tender for the replacement and sustainability of the lighting on the campus. The project includes the removal of existing lighting fixtures, the installation of energy-efficient LED or other sustainable lighting solutions, and the integration of smart control systems where possible. The works must comply with Dutch energy and safety standards, guarantee minimal disruption to educational activities, and provide clear documentation and warranty. The contracting authority expects a technical and financial proposal that optimizes the total lifespan and energy consumption of the new installations.
Works · Open · European procedure
01What is being requested
Stichting Regionaal Opleidingen Centrum Aventus is inviting an open tender for the replacement and sustainability of the lighting on the campus. The project includes the removal of existing lighting fixtures, the installation of energy-efficient LED or other sustainable lighting solutions, and the integration of smart control systems where possible. The works must comply with Dutch energy and safety standards, guarantee minimal disruption to educational activities, and provide clear documentation and warranty. The contracting authority expects a technical and financial proposal that optimizes the total lifespan and energy consumption of the new installations.
Replacement and sustainability of lighting
02Outcome
ITN Installatietechniek BV
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What is the scope of the assignment?
Which technical requirements must the works meet?
What is the objective of the new lighting installation?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159