Replacement of receiving pit RWZI Nieuwveer
Waterschap Brabantse Delta intends to completely redesign and optimize the receiving works at RWZI Nieuwveer via a construction team. The objective is to create a safe working environment for maintenance and to ensure optimal business continuity. The works include civil, mechanical, and electrical structures within the scope from the entry of influent to the first pumping station. The volumetric flow capacity of 16,000 m³/h must be maintained during all works, for which a temporary pumping installation will be deployed. The assignment requires an integrated approach where design, construction, and installation align seamlessly, with an emphasis on safety, reliability, and minimal disruption to the water treatment processes.
Works · Open · European procedure
01What is being requested
Waterschap Brabantse Delta intends to completely redesign and optimize the receiving works at RWZI Nieuwveer via a construction team. The objective is to create a safe working environment for maintenance and to ensure optimal business continuity. The works include civil, mechanical, and electrical structures within the scope from the entry of influent to the first pumping station. The volumetric flow capacity of 16,000 m³/h must be maintained during all works, for which a temporary pumping installation will be deployed. The assignment requires an integrated approach where design, construction, and installation align seamlessly, with an emphasis on safety, reliability, and minimal disruption to the water treatment processes.
The assignment concerns a very coarse-grained, via a construction team, complete redesign and optimization of the receiving works at RWZI Nieuwveer, with a volumetric flow capacity of 16,000 m³/h. Here, the receiving works are defined as follows: from the entry of influent onto the treatment site up to and including the first pumping station. The work concerns all civil, mechanical, and electrical structures and installations within this scope area. The goal of this work is that, through the redesign, safe work can always be performed during maintenance and that business continuity can always
02Outcome
EQUANS Zuid-Nederland B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the exact scope of the works at RWZI Nieuwveer?
How is business continuity ensured during execution?
What are the main objectives of the redesign?
In what manner will the assignment be executed?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159