ClosedWorksEuropeanRestrictedGreen

reconstruction of De Berkenschutse school

Stichting Kempenhaeghe/De Berkenschutse · Restricted · 1 lots · 334147
Type
Works
45214000
Estimated value
€ 8,88M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Kempenhaeghe/De Berkenschutse wishes to contract a contractor for the reconstruction of the De Berkenschutse school building. The tender focuses on a construction team phase in which the final design (DO) and technical design (TO) are elaborated using Stabu specifications. Upon approval, the client will conclude a construction agreement with the main contractor for the realization. The project must comply with the DUMAVA subsidy conditions, including completion before 12 February 2027. The construction team works with a target budget of € 8,878,000 excluding VAT, which may vary during the process. The environmental permit is expected at the end of January 2025. The award phase uses the GOW method with criteria focused on cooperation, safety, and continuity. The tender is non-public and aimed at an integrated approach in which the school, municipality, architect, and contractor work closely together.

Works · Restricted · European procedure

Sustainability countsEuropean
Contract type
Works
Restricted
Estimated value
€8,878,000
estimated value
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPconstruction teamDUMAVAschool

01What is being requested

Stichting Kempenhaeghe/De Berkenschutse wishes to contract a contractor for the reconstruction of the De Berkenschutse school building. The tender focuses on a construction team phase in which the final design (DO) and technical design (TO) are elaborated using Stabu specifications. Upon approval, the client will conclude a construction agreement with the main contractor for the realization. The project must comply with the DUMAVA subsidy conditions, including completion before 12 February 2027. The construction team works with a target budget of € 8,878,000 excluding VAT, which may vary during the process. The environmental permit is expected at the end of January 2025. The award phase uses the GOW method with criteria focused on cooperation, safety, and continuity. The tender is non-public and aimed at an integrated approach in which the school, municipality, architect, and contractor work closely together.

The client wishes to contract a contractor who, in a construction team context together with stakeholders (the school, municipality, architect, contractor, advisor(s)), elaborates the preliminary design (VO) into a Final Design (DO) and a Technical Design (TO) with Stabu specifications. If it is demonstrated that the TO and Stabu specifications fully comply with the program of requirements and are appropriate within the submitted bid, the client will conclude a construction agreement with the main contractor for the actual realization of the building. Through this tender, the contracting autho

45214000€ 8,88MWorks
1reconstruction of De Berkenschutse school€8,878,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€8,878,000

04Likely competitors

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME9531×
2BAM Bouw en Techniek bvSME9434×
3BINX Smartility B.V.SME9427×
4Dura Vermeer Infra Regionale Projecten BVSME8558×
5Rots Bouw B.V.SME8213×
6Burgland Bouw BVSME8113×

05Legal themes that may be relevant here

06Frequently asked questions

What is the intended working method during the design phase?
The assignment is carried out in a construction team context. The contractor works together with the school, municipality, architect, and advisors to elaborate the Preliminary Design (VO) into a Final Design (DO) and a Technical Design (TO) including Stabu specifications.
On which criteria is the best price-quality ratio determined?
The Gunnen op Waarde (GOW) method is used. The award criteria are the plan of approach for the process of cooperation in a construction team context, the plan of approach for safety during multi-phase renovation (while the school remains in use), and the presentation of the main contractor's team including the safeguarding of continuity.
What is the deadline for the completion of the project?
Due to the DUMAVA subsidy conditions, the project must be completed by 12 February 2027 at the latest.
How does the budget relate to the final realization?
A target budget of € 8,878,000 excluding VAT applies to the construction team phase. This budget is based on the schematic design and may increase or decrease during the process, whereby the work will change proportionally.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 8,9 mln

Gegunde waarden in CPV 45 · werken n=3159