PlannedWorksMarktconsultatie

Relocating Fellenoord main sewer

Gemeente Eindhoven · Marktconsultatie · 1 lots · 414749
Type
Works
45232400 · Construction work for
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

This market consultation concerns the preparation of the tender for the relocation of a main sewer in Eindhoven to support the KnoopXL area development. The municipality seeks insight into the feasibility, technical execution, and the implementation of sustainability and cooperation within a construction team (ECI) model.

Works · Marktconsultatie · National procedure

Complete timeline
Contracting authority
Gemeente Eindhoven
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Construction work for sewerage
Location
Netherlands
CharacteristicsCPV 45WorksSewerMain sewerBoring

01What is being requested

The relocation and modification of a new main sewer with a diameter of Ø2000 mm and a route length of approximately 1.5 kilometers. The assignment is part of the KnoopXL area development with an expected investment budget of approximately €40 million. The execution takes place in construction team (ECI) and the realization phase will be carried out under UAV-GC 2025.

The relocation and modification of the main sewer is part of the KnoopXL area development. In this area development, the Eindhoven station environment is being prepared for the future. For this purpose, approximately 9,000 new homes and various large-scale new infrastructures are being realized.   The relocation of the main sewer is a prerequisite for the realization of an underground bus station (Multimodal Knoop). This is because the current route of the main sewer runs directly through the area where the new bus station, including underground bus tunnels, is planned. The execution of the

45232400Works
1Relocating Fellenoord main sewer

02Strategic insight

Strategic insight · AI analysis
<ul Focus on Clean and Emission-free Construction (SEB) and cost commitment, as the municipality is considering these as sub-award criteria. Prepare for a construction team (ECI) model where you join during the VO/DO phase. Take into account the strict requirements regarding accessibility and the impact on the environment (BLVC) in the urban context of Eindhoven.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
Equipment: Minimum contract requirements for Clean and Emission-free Construction (SEB) apply as a lower limit for tools, transport means, and equipment.Important
Execution: The method of execution (guided boring or open excavation) will be determined later within the construction team (ECI).Important
ProRail: Agreements regarding safety, execution method, and permits at the Elisabethtunnel are prerequisites.Important
Stakeholders: A proactive stance is expected for managing accessibility, livability, and social safety (BLVC).Important
Contract: The realization phase will take place under the regime of the UAV-GC 2025.Important

04Can I take part?

Financial — Financial and economic capacity, such as solvency and/or liquidity requirements, insurance against professional risks or securities.
Technical — Technical and professional competence based on references, overview of personnel or equipment, or certificates.

05Award criteria

Clean and Emission-free Construction (SEB)weight n/a

The municipality wishes to stimulate the use of equipment that contributes to Clean and Emission-free Construction as added value above the lower limit with a sub-award criterion.

Cost commitment for the execution phaseweight n/a

The municipality wishes to request cost commitment for the execution phase as added value with a sub-award criterion.

06Process & timeline

Publication of consultation
donderdag 5 maart 2026
Start meeting
dinsdag 17 maart 2026
Closing date for submitting questions and comments
dinsdag 24 maart 2026 14:00
Publication of memorandum of clarification (target date)
donderdag 26 maart 2026
Closing date for submitting questionnaire
dinsdag 31 maart 2026 14:00
Reservation of interviews
7 april t/m 9 april 2026
Announcement of market consultation results (target date)
maandag 4 mei 2026
Preliminary design (approved)
Maart 26 - Augustus 26
Tender process
September 2026 - Mei 2027
Award and preparation of party
April 2027 - Mei 2027
Elaboration of DO + UO in construction team
Juni 2027 - Juni 2028
Execution
Juli 2028 - September 2029
Eerste oplevering
Oktober 2029
Nazorgfase
Oktober 2029 - December 2029
Ingebruikname uiterlijk
1 januari 2030

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9773×
2Van Gelder BVSME9753×
3Heijmans Infra B.V.SME9765×
4Dura Vermeer Infra Regionale Projecten BVSME9758×
5KWS Infra B.V.SME9692×
6Boskalis Nederland B.V.SME9669×

09Tender documents

Fellenoord stamriool marktconsultatie NvI 1.1pdfMar 24, 2026 · 660 KB
Fellenoord stamriool marktconsultatie startgesprek presentatiepdfMar 19, 2026 · 2202 KB
Fellenoord stamriool marktconsultatie startgesprek procesverslagpdfMar 19, 2026 · 144 KB
Fellenoord stamriool marktconsultatie procespdfMar 5, 2026 · 824 KB
Fellenoord stamriool marktconsultatie vragenlijstdocxMar 5, 2026 · 6714 KB
TN575618 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260305171632pdfMar 5, 2026 · 176 KB

10Legal themes that may be relevant here

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159