AwardedSuppliesEuropeanOpen

Units for semi-permanent housing RWZI Hengelo

Waterschap Vechtstromen · Open · 352564
Type
Supplies
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Waterschap Vechtstromen is conducting an open EU procurement process to select a contractor to design, manufacture, deliver, and install semi-permanent office units at the RWZI Hengelo. The current units must be replaced; the new units must comply with the legal requirements of the Besluit Bouwwerken Leefomgeving (BBL) for new construction, given the uncertainty regarding future expansions. The completion date is set for 1 May 2025. The tender focuses on a turnkey package: design, fabrication, transport, installation, and finishing. The contracting authority expects a flexible, sustainable solution that can be deployed quickly and meets safety and environmental standards. The procedure is public, allowing a wide range of suppliers to participate.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVSuppliesEU tendersemi-permanent office unitsRWZI HengeloVechtstromen

01What is being requested

Waterschap Vechtstromen is conducting an open EU procurement process to select a contractor to design, manufacture, deliver, and install semi-permanent office units at the RWZI Hengelo. The current units must be replaced; the new units must comply with the legal requirements of the Besluit Bouwwerken Leefomgeving (BBL) for new construction, given the uncertainty regarding future expansions. The completion date is set for 1 May 2025. The tender focuses on a turnkey package: design, fabrication, transport, installation, and finishing. The contracting authority expects a flexible, sustainable solution that can be deployed quickly and meets safety and environmental standards. The procedure is public, allowing a wide range of suppliers to participate.

Waterschap Vechtstromen is issuing this open EU procurement to find a contractor capable of providing the construction, delivery, and placement of semi-permanent office units at our sewage treatment plant in Hengelo. There are currently office units on this site that need to be replaced. Because it is uncertain which processes will be added to the RWZI in the future, the choice has been made for new office units that comply with the legal requirements of the Besluit Bouwwerken Leefomgeving (BBL) for new construction. Vechtstromen aims for a completion date of 1 May 2025.

Supplies

02Outcome

Awarded

Van den Nagel Modulaire Bouw B.V.

Bidders
4

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Van den Nagel Modulaire Bouw B.V. potentialSME40
2Aannemingsbedrijf Platenkamp B.V. potentialSME39
3Dutch Spiral B.V. potentialSME38
4Pannekoek GWW B.V. potentialSME38
5Wagenbouw Bouwsystemen B.V. potentialSME37
6Bouwhuis Aannemingsmaatschappij "Bouwmij" B.V. potentialSME36

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the contract for the office units?
The contract comprises a turnkey package consisting of the design, fabrication, transport, installation, and finishing of the semi-permanent office units.
Which legal building regulations must the new units comply with?
The new office units must comply with the legal requirements of the Besluit Bouwwerken Leefomgeving (BBL) for new construction.
What is the intended completion date of the units at RWZI Hengelo?
The intended completion date for the delivery and placement of the units is set for 1 May 2025.
What is the purpose of replacing the current units?
The current units at the sewage treatment plant in Hengelo must be replaced by new units that comply with the current legal requirements for new construction.

Automatically compiled from the official tender data and documents.