AwardedWorksEuropeanSME-friendlyRestrictedGreen

Executing parties Turfmarkt

Gemeente Zwolle · Restricted · 2 lots · 348838
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence moderate

The Municipality of Zwolle is looking for a building contractor and an installer for the new construction of Turfmarkt 5 in a construction team arrangement.

Works · Restricted · European procedure · SME-friendly

SME-friendlySustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendlyEU tenderGreen / SPP

01What is being requested

The assignment concerns the replacement new construction of Turfmarkt 5 (an MFA) by a building contractor and an installer via a construction team. The execution has an expected duration of 32 months.

The municipality is looking for a building contractor and installer for the replacement new construction of Turfmarkt 5 (a Multifunctional Accommodation (MFA)). An architect, structural engineer, and advisors for building physics, acoustics, fire safety, sustainability, and circularity have already been selected. The Municipality of Zwolle has chosen to develop the project using a construction team model, in which the building contractor and installer join from the DO phase (Definitief Ontwerp). They bring their knowledge and construction experience to the process to collectively achieve an ef

45000000Works
1Building contractor
2Installer

02Outcome

Awarded

Unica Installatietechniek B.V.

Bidders
4

03Breakdown by lot

Building contractorn/a
Installern/a

Per-lot values not published — bars show only the lot breakdown.

04Strategic insight

Strategic insight · AI analysis
Please note that the final weightings of the criteria will only be established in the Award Guidelines. For the building party, it is essential to accept the role of project coordinator. Provide a full substantiation of the collaboration within the construction team.
Read automatically from the tender documents using AI. Always verify against the original documents.

05Points of attention

Important · 5
The building contractor is responsible for the coordination of the entire project.Important
A coordination agreement must be signed by both contractors.Important
Bidders making use of the capabilities of third parties must complete a declaration.Important
A declaration must be made regarding Russian involvement.Important
Bidders must indicate whether there is any conflict of interest or prior knowledge.Important

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Award criteria

Quality0

It is expected that the following qualitative sub-award criteria will be used: GC 2: Collaboration in construction team; GC3. Planning and communication; GC4. Vision on sustainability; GC5. Cost control. The further details of the sub-award criteria will be included in the Award Guidelines.

Price0

The details of this sub-award criterion will be included in the Award Guidelines.

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Bidders in this segment

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME9731×
2BAM Bouw en Techniek bvSME9734×
3BAM Infra B.V.SME9777×
4BINX Smartility B.V.SME9627×
5Van Gelder BVSME9653×
6Unica Installatietechniek B.V.SME9613×

10Tender documents

TN482869 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250320165440pdfMar 22, 2025 · 14 KB
NvI selectiefase TurfmarktxlsxOct 2, 2024 · 21 KB
UEA Turfmarkt uitvoerende partijen (1)pdfOct 2, 2024 · 1664 KB
TN482869 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240912094422pdfSep 13, 2024 · 18 KB
uea_482869_20240912092557pdfSep 13, 2024 · 1664 KB
Bijlage B Opgave referentieopdrachtendocxSep 13, 2024 · 23 KB
Bijlage D HoldingverklaringdocxSep 13, 2024 · 282 KB
Bijlage F Vragenlijst voorkennis en belangenverstrengelingdocxSep 13, 2024 · 23 KB
Bijlage C Verklaring Russische partijendocxSep 13, 2024 · 788 KB
Bijlage E Verklaring omtrent beroep op bekwaamheid derdendocxSep 13, 2024 · 22 KB
Bijlage A BegrippenlijstdocxSep 13, 2024 · 23 KB
Selectieleidraad uitvoerende partijen Turfmarkt V1.0pdfSep 13, 2024 · 323 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the intended method for the realization of the Turfmarkt 5?
The Municipality of Zwolle has chosen to develop the project in a construction team. The building contractor and installer join from the Definitief Ontwerp (DO) phase to collectively achieve an efficient, affordable, and circular building.
Which disciplines have already been selected for this project?
For the replacement new construction of the Turfmarkt 5, the architect, structural engineer, and advisors for building physics, acoustics, fire safety, sustainability, and circularity have already been selected.
What is the role of the building contractor within the collaboration?
The building contractor is responsible for the coordination of the entire project. For this purpose, a coordination agreement will be signed by both contractors (the building contractor and the installer).

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159