ClosedWorksOpen

Expansion Plan Broek Zuid BRM phase 2

Gemeente De Fryske Marren · Open · 1 lots · 348038
Type
Works
45222000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project concerns the site preparation of the second phase of the Expansion Plan Broek Zuid by the Municipality of De Fryske Marren, with a target completion in October 2025.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Execution of the site preparation of the second phase of the Expansion Plan Broek Zuid in Joure, including earthworks, sewerage works, and coastal and bank works.

The contract concerns “Expansion Plan Broek Zuid BRM phase 2”. idea The work to be performed is located along It Sud and the Omkromte on the western side of Joure. Below follows a general, non-exhaustive list of the works to be performed to provide an overview of the contract; The contract mainly consists of: a. Site clearance works; b. Removal of culverts; c. Removal of sheet piling; d. Removal of asphalt paving; e. Excavating, transporting, and processing soil; f. Installation of sheet piling; g. Installation of sewerage; h. Setting curb heights; i. Installation of gullies; j. Installation o

45222000Works
1Expansion Plan Broek Zuid BRM phase 2

02Strategic insight

Strategic insight · AI analysis
Take into account the specific SROI requirement of 2% of the contract sum. Ensure precise coordination with the utility companies for the installation of facilities from week 40-50 2025. Note the performance obligations regarding soil flows as indicated in the specifications.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The SROI amounts to 2% of the contract sum in accordance with the Frisian Requirement.Important
The contractor is responsible for the correct compliance with the traffic measures.Important
The watertightness of pipes must be demonstrated according to the prescribed RAW method.Important
The completion date is set for 10 October 2025.Important

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME10069×
2KWS Infra B.V.SME9992×
3Heijmans Infra B.V.SME9965×
4Dura Vermeer Infra Regionale Projecten BVSME9858×
5Combinatie Heijmans - SWARCOUnknown9773×
6Van Gelder BVSME9753×

06Tender documents

240925-jagouw-2024RO15 NvIpdfSep 26, 2024 · 1844 KB
240925-elzwie-Fase 2-bouwrijp tekening-D01-Nota-1 van 3pdfSep 26, 2024 · 3663 KB
240925-elzwie-Fase 2-bouwrijp tekening-D01-Nota-2 van 3pdfSep 26, 2024 · 989 KB
240925-elzwie-Fase 2-bouwrijp tekening-D01-Nota-3 van 3pdfSep 26, 2024 · 2127 KB
240925-boutji-2024RO15-D1 incl NvIrsxSep 26, 2024 · 703 KB
240902-Bijlage 2.1-bijlagen bij bestek 2024RO15pdfSep 5, 2024 · 15167 KB
240805-elzwie-Fase 2-bouwrijp tekening-C01-DoorsnedenpdfSep 5, 2024 · 900 KB
240805-elzwie-Fase 2-bouwrijp tekening-C01-SituatiepdfSep 5, 2024 · 3820 KB
uea_472597_20240902101541pdfSep 5, 2024 · 1586 KB
TN472597 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240905101844pdfSep 5, 2024 · 9 KB
240805-elzwie-Fase 2-bouwrijp tekening-C01-Tekening SteigerspdfSep 5, 2024 · 2098 KB
240902-jagouw-Inschrijvingsleidraad 2024RO15 TenderNed 472597pdfSep 5, 2024 · 979 KB

07Legal themes that may be relevant here

08Frequently asked questions

What percentage of Social Return (SROI) applies to this contract?
The contracting authority adheres to the Social Return paragraph Friesland ('De Friese Eis'), whereby 2% of the contract sum is maintained.
Which specific works are carried out within the project?
The works include, among others, site clearance works, the removal of culverts, sheet piling, and asphalt paving, excavating, transporting, and processing soil, the installation of sheet piling, sewerage, foundations, and bituminous paving.
What are the quantities of the materials and works to be delivered?
The contract includes, among others, earthworks of approx. 70,000 m3, delivery of approx. 7,500 m3 of sand and 3,300 m3 of erosion-resistant clay, the installation of approx. 1,650 m of main sewerage, the installation of approx. 2,100 m of wooden sheet piling, approx. 5,800 m2 of foundation material, and approx. 1,300 tons of asphalt paving.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159