AwardedWorksEuropeanOpen

Tram Line 19: Mekelweg and Overhead Line

Metropoolregio Rotterdam- Den Haag · Open · 1 lots · 282930
Type
Works
45234100
Estimated value
€ 7,30M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This tender concerns the construction of a section of tram line 19 on the Mekelweg in Delft, from the Jaffalaan to the Van den Broekweg, including the Mekelpark. Additionally, the project includes the construction of a new overhead line from the connection on line 1 at Westvest to the new terminus on the Van den Broekweg. The work requires precise coordination with existing infrastructure, traffic management, and environmentally friendly solutions. The contracting authority is the Metropoolregio Rotterdam-Den Haag, and the procedure is public. The works include, among other things, the relocation of underground utilities, the laying of tracks, the construction of shelters, and the installation of the electric overhead line. Safety measures, minimal traffic disruption, and ensuring the continuity of the tram service are crucial. The tender focuses on companies with experience in tram and overhead line construction, knowledge of urban construction projects, and the ability to deliver within strict timelines.

Works · Open · European procedure

European
Contract type
Works
Open
Estimated value
€7,297,000
awarded value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Rotterdam
CharacteristicsCPV 45WorksEU tendertramoverhead linetrack construction

01What is being requested

This tender concerns the construction of a section of tram line 19 on the Mekelweg in Delft, from the Jaffalaan to the Van den Broekweg, including the Mekelpark. Additionally, the project includes the construction of a new overhead line from the connection on line 1 at Westvest to the new terminus on the Van den Broekweg. The work requires precise coordination with existing infrastructure, traffic management, and environmentally friendly solutions. The contracting authority is the Metropoolregio Rotterdam-Den Haag, and the procedure is public. The works include, among other things, the relocation of underground utilities, the laying of tracks, the construction of shelters, and the installation of the electric overhead line. Safety measures, minimal traffic disruption, and ensuring the continuity of the tram service are crucial. The tender focuses on companies with experience in tram and overhead line construction, knowledge of urban construction projects, and the ability to deliver within strict timelines.

Construction of a section of tram line 19 at the Mekelweg in Delft, from the Jaffalaan to the Van den Broekweg, passing through the Mekelpark. Construction of overhead line from the connection on line 1 at Westvest up to and including the new terminus on the Van den Broekweg.

45234100Works
1Lot 1

02Outcome

Awarded

Dura Vermeer Railinfra B.V.

Award value
€7,297,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3Van Gelder BVSME10053×
4Dura Vermeer Infra Regionale Projecten BVSME9958×
5Strukton Rail Nederland bvSME9733×
6VolkerRail Nederland B.V.SME9630×

06Frequently asked questions

What does the assignment for the construction of tram line 19 entail?
The assignment concerns the construction of a section of tram line 19 at the Mekelweg in Delft, running from the Jaffalaan to the Van den Broekweg through the Mekelpark. Additionally, the overhead line will be constructed from the connection on line 1 at Westvest to the new terminus on the Van den Broekweg.
Which works are part of this project?
The works include, among other things, the relocation of underground utilities, the laying of tracks, the construction of shelters, and the installation of the electric overhead line.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 7,3 mln

Gegunde waarden in CPV 45 · werken n=3159