OpenSuppliesEuropeanOpen

Tractors and earthmoving machinery

Gemeente Amsterdam · Open · 1 lots · 425536
Type
Supplies
16100000 · Agricultural or forest
Estimated value
€ 16M
estimated
To deadline
17d
Jul 7, 2026 · 07:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

Supply and maintenance of tractors and earthmoving machinery for the Municipality of Amsterdam with a maximum contract value of 20 million euros over a period of 6 years.

Supplies · Open · European procedure

European
Contracting authority
Noord-Holland
Contract type
Supplies
Open
Estimated value
€16,000,000
estimated value
Submission deadline
July 7, 2026
07:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Agricultural or forestry machinery, for soil preparation or cultivation
Location
Amsterdam, Noord-Holland
CharacteristicsCPV 16SuppliesEU tenderTractorsEarthmoving machineryRepair

01What is being requested

The assignment concerns the supply of tractors and earthmoving machinery, including repair, maintenance, and damage repair (ROS), for a maximum duration of 6 years. The estimated contract value is € 16,000,000, with a maximum contract value of € 20,000,000.

This tender concerns the supply of tractors and earthmoving machinery, including repair, maintenance, and damage repair (ROS). The ROS applies to both the newly to be delivered machines and the machines already in the possession of the Municipality of Amsterdam. The tender bears the title “Tractors and earthmoving machinery”, as these product categories represent the highest value. However, the scope of the tender includes multiple product categories. The following product categories fall under this tender: Irrigation machines, Trenchers, Earthmoving machinery, Aerial work platforms and sciss

16100000€ 16MSupplies
1Tractors and earthmoving machinery€16,000,000

02Strategic insight

Strategic insight · AI analysis
Ensure full integration with E-invoicing and the SAP Business Network to prevent administrative delays. Prepare a strong substantiation regarding zero-emission machines and sustainability, as this is a core priority. Take into account the Social Return obligation of 3% in the pricing and business operations. Ensure that the service provision (ROS) can effectively cover the dispersed locations (approximately fifty municipal yards and parks).
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
All motor-driven machines to be delivered must be zero-emission, unless a zero-emission variant is unavailable or falls outside the budget.Important
The contractor is responsible for the transfer of all necessary data and information to a new supplier without charging any costs.Important
There is a mandatory Social Return obligation of at least 3% of the total contract value (excluding VAT).Important
Invoicing must comply with the requirements of the Municipality of Amsterdam and a connection to the SAP Business Network is requested.Important
The contractor must submit a management report quarterly in accordance with the format provided by the Municipality.Important

04Can I take part?

Technical — Comply with the Program of Requirements (minimum requirements) as described in 20233103 PvE Tractoren en Grondverzetmachines(16621750).xlsx.
Financial — For amounts above € 1,000, a purchase order number is mandatory on the invoice.

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

Best Price Quality Ratio (BPKV)weight n/a

The municipality assesses based on the award criterion Most Economically Advantageous Tender (MEAT) on the basis of Best Price Quality Ratio (BPKV) using the methodology: Award on Value. In this, the price and qualitative elements are weighted.

07Value in context

€16,000,000

08Likely competitors

#Likely bidderFitWins
1Kraakman BVSME94
2Voets Tractoren en Werktuigen B.V.SME83
3GroeNoord Ag&Turf B.V.SME79
4Steenbergen Hoekse Waard B.V.SME77
5Voets Wieringerwerf B.V.SME76
6Abemec B.V.SME76

09Tender documents

Invulblad kerncompetentie.docdocMay 20, 2026 · 76 KB
De Opdracht.pdfpdfMay 20, 2026 · 94 KB
Beschrijving.pdfpdfMay 20, 2026 · 29 KB
rekenvoorbeeld Plan van Aanpak.xlsxxlsxMay 20, 2026 · 25 KB
Prijzenblad Tractoren en grondverzetmachines.xlsxxlsxMay 20, 2026 · 29 KB
Subgunningscriterium Uitstootvrij.xlsxxlsxMay 20, 2026 · 24 KB
Catalogus Tractoren en Grondverzetmachines.pdfpdfMay 20, 2026 · 444 KB
Begrippenkader 200055.docxdocxMay 20, 2026 · 63 KB
Thuislocaties Tractoren en Grondverzetmachines.docxdocxMay 20, 2026 · 42 KB
Service Level Agreement Tuin- en Parkmachines v1.0.docxdocxMay 20, 2026 · 121 KB
algemene_inkoopvoorwaarden_gemeente_amsterdam_d_d_27-5-2020.pdfpdfMay 20, 2026 · 568 KB
Prijs.pdfpdfMay 20, 2026 · 37 KB

10Legal themes that may be relevant here

11Frequently asked questions

Which machine categories fall under the scope of this assignment?
The assignment includes the supply of tractors, earthmoving machinery, irrigation machines, trenchers, aerial work platforms, scissor lifts, agricultural and horticultural machinery, and transport vehicles without license plates. The repair, maintenance, and damage repair (ROS) of these machines is also part of the assignment.
Must maintenance also be performed on the existing machine fleet?
Yes, the ROS process (repair, maintenance, and damage repair) applies to both the newly to be delivered machines and the machines already in the possession of the Municipality of Amsterdam. Bidders must have demonstrable capacity for the maintenance and repair of this existing machine fleet.
What requirements must the accessibility of the contract manager meet?
The contract manager must be directly reachable by telephone on working days between 08:00 and 17:00 or must call back within 1 working hour. Additionally, all questions from the contracting authority must be responded to via email within 8 working hours.
When must the Service Level Agreement (SLA) be finalized?
The SLA, including the KPIs included therein, will be further elaborated after the final award based on the bid. The final SLA must be ready within 6 weeks after the final award and must be signed by both parties.
What are the rules regarding digital ordering processes?
During the term of the agreement, the contracting authority may decide to provide orders and information digitally. The contractor must organize the company accordingly. Any costs for adjustments to equipment or software are for the account of the contractor.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 160K
median
€ 298K
p75
€ 1,2 mln
€ 16 mln

Gegunde waarden in CPV 16 · leveringen n=110