OpenServicesEuropeanRestrictedGreen

Total engineer - New construction Venlo

Fontys Hogeschool · Restricted · 1 lots · 425801
Type
Services
71000000 · Services related to ar
Estimated value
Not published
To deadline
15d
Jun 30, 2026 · 08:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

This tender concerns the selection of a Total engineer for the integral engineering and design development of approximately 12,800 m² GFA new construction at the Fontys Campus Venlo.

Services · Restricted · European procedure

Sustainability countsEuropeanComplete timeline
Contracting authority
Limburg
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
June 30, 2026
08:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Services related to architecture, building construction, civil engineering and inspection
Location
Venlo, Limburg
CharacteristicsCPV 71ServicesEU tenderGreen / SPPdesign teamnew constructionarchitect

01What is being requested

The assignment concerns the integral engineering, design development, advisory, and technical coordination for the realization of approximately 12,800 m² GFA new construction for Campus Venlo. The activities include developing a flexible building concept for approximately 2,750 students and 250 FTE employees.

The assignment concerns the integral engineering, design development, advisory, and technical coordination for the realization of approximately 12,800 m² GFA new construction for Campus Venlo. The realization takes place at the current location at Tegelseweg 255, as a replacement for the outdated building W1 and part of the campus site. After the realization of the new construction, building W1 will be demolished. Subsequently, part of the site will be redesigned according to the new campus concept and surface parking will be realized at ground level. The repurposing of building W3 and the are

71000000Services
1Total engineer - New construction Venlo

02Strategic insight

Strategic insight · AI analysis
Form a combination of disciplines to meet the integral requirements. Ensure that the lead party is contractually responsible while the disciplines are directly represented. Focus strongly during the selection phase on the integral cohesion of the design team.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
Acquisition following this tender is not appreciated.Important
The realization of the new construction does not form part of this assignment.Important
The Total engineer is not intended as a construction management firm.Important
All correspondence takes place exclusively via TenderNed.Important
To avoid exclusion, it is not permitted to seek contact otherwise with the contracting authority.Important

04Can I take part?

Financial · 1
Requirements regarding financial and economic standingFinancial
Technical · 1
Requirements for professional and technical competenceTechnical
Professional capability · 1
Requirements for professional authorization (Registration in a trade or professional register)Professional capability

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Process & timeline

Publication date Selection Guide
20 mei 2026
Closing date written questions
8 juni 2026
Answers to questions Nota van Inlichtingen
17 juni 2026
Deadline for submission of Expressions of Interest
30 juni 2026
Communication of selection phase results
9 juli 2026
End of standstill period selection phase
16 juli 2026
Target date invitation to tender
27 augustus 2026
Closing date questions 1st round
10 september 2026
Answers to questions 1st round
18 september 2026
Closing date questions 2nd round
25 september 2026
Answers to questions 2nd round
2 oktober 2026
Deadline for submission of Tenders
13 oktober 2026
Presentaties
28 of 29 oktober 2026
Streefdatum voornemen tot gunning
4 november 2026
Streefdatum definitieve gunning
26 november 2026
Ingangsdatum Overeenkomst
8 december 2026

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Likely competitors

#Likely bidderFitWins
1Arcadis Nederland B.V.SME100151×
2Haskoning Nederland B.V.SME100129×
3Sweco Nederland B.V. SME10095×
4Antea Nederland BVSME9777×
5Movares Nederland B.V.SME9666×
6BDG Architecten Ingenieurs Zwolle B.V.SME9515×

09Tender documents

Bijlage 1.2 Voorbeeldpagina bouwstenenpdfMay 21, 2026 · 188 KB
Bijlage 1.2 Voorbeeld inhoud RF PvEpdfMay 21, 2026 · 231 KB
Bijlage 1.2 Voorbeeld inhoud PvE VastgoedpdfMay 21, 2026 · 477 KB
Bijlage 1.2 Voorbeeldpag technische eisen EpdfMay 21, 2026 · 165 KB
Bijlage A1 Geschiktheidseis K1docxMay 21, 2026 · 41 KB
Bijlage A3 Geschiktheidseis K3docxMay 21, 2026 · 33 KB
Bijlage A2 Geschiktheidseis K2docxMay 21, 2026 · 35 KB
Bijlage 1.2 Voorbeeldpag technische eisen BFpdfMay 21, 2026 · 313 KB
Bijlage 1 Ambitiekader Campus Venlo 2026-05-20pdfMay 21, 2026 · 582 KB
Bijlage 1.2 Voorbeeldpag technische eisen WpdfMay 21, 2026 · 210 KB
Bijlage 1.2 Voorbeeldpag technische eisen BpdfMay 21, 2026 · 233 KB
Bijlage 1.2 Voorbeeldpagina RF PvEpdfMay 21, 2026 · 342 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the scope and purpose of the assignment?
The assignment concerns the integral engineering, design development, advisory, and technical coordination for the realization of approximately 12,800 m² GFA new construction. This serves as a replacement for the outdated building W1 and includes the redesign of the site.
What are the specific tasks of the Total Engineer?
The Total Engineer advises Fontys and investigates, compares, and substantiates various design variants. The goal is to realize a technically feasible, sustainable, and future-proof design within the spatial, functional, and quality frameworks.
Which components fall outside the scope of this project?
The repurposing of building W3 and the area immediately surrounding W3 fall outside the scope of this new construction project.
What experience requirements must a bidder meet?
Bidders must have the capacity for integral engineering and technical coordination of large-scale new construction and have demonstrable experience with integral engineering and technical design in complex new construction projects.
What characterizes the technical complexity of this assignment?
The technical complexity is determined by the combination of the demolition of building W1 and the realization of the new construction of approximately 12,800 m² GFA.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713