Cables and Pipelines Supervisor (CBT24 1404)

Gemeente Amstelveen · Competitive procedure with negotiation · 1 lots · 366972
Type
Services
79421100
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Application for a Cables and Pipelines Supervisor within the KPN fiber optic project. The role consists of continuity supervision of the execution after the one-year guarantee period, including inspection, coordination with the project manager, and drafting official reports. The assignment runs until 01-01-2026 and may be extended depending on the project results.

Services · Competitive procedure with negotiation · European procedure

European
Contracting authority
Contract type
Services
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 79ServicesEU tender

01What is being requested

Application for a Cables and Pipelines Supervisor within the KPN fiber optic project. The role consists of continuity supervision of the execution after the one-year guarantee period, including inspection, coordination with the project manager, and drafting official reports. The assignment runs until 01-01-2026 and may be extended depending on the project results.

Concerns a contract for the purpose of ensuring the continuity of the execution of the current project. Supervising the KPN fiber optic project by inspecting routes after the expiration of the 1-year guarantee period and drafting official reports of completion for this purpose.The role of the supervisor:As a supervisor, you guide the execution of the projects in close consultation and in cooperation with the project manager.You are focused on execution processes and have a sense for the interests of the various parties involved in the projects.You ensure that the work is realized in accor

79421100Services
1Cables and Pipelines Supervisor (CBT24 1404)

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Bender Detachering B.V.SME97107×
2YER Nederland B.V.SME9797×
3Bright ProfessionalsUnknown9679×
4TenMonks B.V.SME9569×
5Yacht B.V.SME9456×
6DC Professionals BVSME9447×

05Legal themes that may be relevant here

06Frequently asked questions

What is the core task of the supervisor in this project?
The supervisor supervises the KPN fiber optic project by inspecting routes after the one-year guarantee period and drafting an official report of completion for this purpose. Additionally, the supervisor advises on deviations in the execution and ensures that the work is realized in accordance with the contract and the stated requirements.
What is the expected duration of the assignment?
The assignment runs until 1 January 2026. There is a possibility of extension, whereby this extension is dependent on the delivery and the necessity for aftercare.
What does the cooperation with the project management look like?
The supervisor guides the execution of the projects in close consultation and in cooperation with the project manager, with a focus on the execution processes and weighing the interests of various parties.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 200K
median
€ 640K
p75
€ 3,0 mln
deze opdracht

Gegunde waarden in CPV 79 · diensten n=4949