AwardedServicesRestricted

Future-proof Water System

Waterschap Hunze en Aa's · Restricted · 283338
Type
Services
72230000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This non-public assignment from Waterschap Hunze en Aa's focuses on obtaining systematic, model-based insight into the current state and bottlenecks of the water system. The contractor must perform precipitation-runoff modelling and testing, with the primary result being a report including maps that visualize the problematic areas. The findings shall serve as a basis for policy choices regarding the preservation and design of a future-proof water system, taking into account the water nuisance standards. The assignment requires a combination of hydrological modelling, GIS analysis, and policy interpretation, and delivers a strategic document that supports the water manager in planning interventions.

Services · Restricted · National procedure

Contracting authority
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 72Serviceswater systemprecipitation-runoff modellingwater nuisance standards

01What is being requested

This non-public assignment from Waterschap Hunze en Aa's focuses on obtaining systematic, model-based insight into the current state and bottlenecks of the water system. The contractor must perform precipitation-runoff modelling and testing, with the primary result being a report including maps that visualize the problematic areas. The findings shall serve as a basis for policy choices regarding the preservation and design of a future-proof water system, taking into account the water nuisance standards. The assignment requires a combination of hydrological modelling, GIS analysis, and policy interpretation, and delivers a strategic document that supports the water manager in planning interventions.

The objective of the assignment is to obtain systematic and model-based insight into the 'state' and bottlenecks of the water system in order to make policy choices regarding the preservation and/or design of a future-proof water system and compliance with water nuisance standards. The contractor is required to perform the precipitation-runoff modelling and testing of the water system. The primary result of the assignment is a report with maps showing the bottlenecks of the water system.

72230000Services

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

03Bidders in this segment

#Likely bidderFitWins
1Ordina Unknown8620×
2Visma Raet B.V.SME8618×
3Unit4 Business Software Netherlands B.V.SME8415×
4Sogeti Nederland B.V. SME7916×
5Haskoning Nederland B.V.SME74
6Antea Nederland BVSME72

04Tender documents

TN391919 - SF02 Aankondiging van een opdracht 20221220160032pdfDec 20, 2022 · 25 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the Toekomstbestendig Watersysteem assignment?
The objective is to obtain systematic and model-based insight into the state and the bottlenecks of the water system. This insight serves as a basis for policy choices regarding the preservation or design of a future-proof water system and compliance with water nuisance standards.
What are the main activities that the contractor must perform?
The contractor performs precipitation-runoff modelling and testing of the water system. This involves applying a combination of hydrological modelling, GIS analysis, and policy interpretation.
What is the primary result of this assignment?
The primary result is a report including maps that visualize the bottlenecks of the water system.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 327K
median
€ 800K
p75
€ 2,5 mln
deze opdracht

Gegunde waarden in CPV 72 · diensten n=1436