Waterschap Vechtstromen has announced an awarded contract for the replacement of the RWZI Tubbergen. The new installation requires effluent post-treatment that reduces phosphorus and suspended solids to 1 mg/l TP and <30 mg/l VSS. The chosen solution is a proven combination of a cloth filter and a flocculation tank, supplied and installed by Eliquo Water & Energy B.V. The procurement was carried out via a negotiated procedure without prior publication, because according to the contracting authority, no technical alternative exists and the market is limited to a single supplier. The contract was originally published as lot 7 within a lotting scheme, but has been amended such that the scheme is no longer applicable. The procedure falls under the open procurement regime, but competition is excluded on the basis of Article 2.32 paragraph 1 sub b of the Aanbestedingswet.
Works · Open · European procedure
01What is being requested
Waterschap Vechtstromen has announced an awarded contract for the replacement of the RWZI Tubbergen. The new installation requires effluent post-treatment that reduces phosphorus and suspended solids to 1 mg/l TP and <30 mg/l VSS. The chosen solution is a proven combination of a cloth filter and a flocculation tank, supplied and installed by Eliquo Water & Energy B.V. The procurement was carried out via a negotiated procedure without prior publication, because according to the contracting authority, no technical alternative exists and the market is limited to a single supplier. The contract was originally published as lot 7 within a lotting scheme, but has been amended such that the scheme is no longer applicable. The procedure falls under the open procurement regime, but competition is excluded on the basis of Article 2.32 paragraph 1 sub b of the Aanbestedingswet.
Introduction Through this announcement of an awarded contract, Waterschap Vechtstromen wishes to inform market parties of a contract awarded to Eliquo Water & Energy B.V. The contracting authority has followed a negotiated procedure without prior publication, as referred to under paragraph 2.2.1.7. of the Aanbestedingswet 2012, with Eliquo for the application of a cloth filter in combination with a flocculation tank (proven technology). Explanation and motivation for the chosen procedure Because the existing sewage treatment plant (RWZI) Tubbergen will no longer be able to me
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of the post-treatment at the RWZI Tubbergen?
Which technical solution has been chosen for the effluent post-treatment?
Why was a procedure without prior publication chosen?
Was the contract originally offered via a lotting scheme?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln