OpenServicesEuropeanOpen

Telemetry management of groundwater level measurements Amsterdam monitoring network 2026-2033

Stichting Waternet · Open · 1 lots · 413529
Type
Services
72310000 · Data processing servic
Estimated value
€ 11M
estimated
To deadline
-56d
Apr 20, 2026 · 12:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

Execution of the telemetry management of the groundwater monitoring network in Amsterdam for the period 2026-2033, including installation, management, and data delivery.

Services · Open · European procedure

EuropeanComplete timeline
Contracting authority
Contract type
Services
Open
Estimated value
€11,000,000
estimated value
Submission deadline
April 20, 2026
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Data processing services
Location
Netherlands
CharacteristicsCPV 72ServicesEU tendertelemetrygroundwatermonitoring network

01What is being requested

The assignment concerns the telemetry management of groundwater level measurements for the Amsterdam monitoring network during an initial term of seven (7) years. The activities include the installation and management of telemetry equipment in approximately 2,500 existing piezometers, whereby the number of measuring points is expected to increase by approximately 250 measuring points. The assignment consists of three main parts: one-off activities during the implementation phase, one-off activities during the term, and the data subscription.

Description of the Assignment/Task. The Contracting Authority wishes to enter into an agreement with one (1) supplier for the management of telemetry groundwater level measurements for the Amsterdam groundwater monitoring network, for the period 2026-2033. Scope of the assignment. At the start of the monitoring contract, it concerns approximately 2,500 existing piezometers, in which telemetry equipment will be installed. During the contract period, a need may arise for new project-based monitoring networks from the Municipality of Amsterdam or expansions of the monitoring network in newly deve

72310000€ 11MServices
1Telemetry management of groundwater level measurements Amsterdam monitoring network 2026-2033€11,000,000

02Strategic insight

Strategic insight · AI analysis
<ul Focus on the quality score, as this carries the heaviest weight in the award at 70%. Ensure a solid plan for the implementation phase and the transition to the BRO. Take into account the flexibility required for a growing and dynamic monitoring network.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The contract duration was chosen based on the technical lifespan of the equipment (approximately 7 years).Important
A transition period of a maximum of 1 year is provided at the end of the agreement for knowledge and data migration.Important
The take-off obligation and quantities may change during the contract period due to a dynamic monitoring network.Important
All communication must take place exclusively via Mercell.Important
Bidders must take into account the dynamics of the contracting authority, whereby the scope or composition may change.Important

04Can I take part?

Professional capability · 1
Registration in professional and/or trade registerProfessional capability
Technical · 5
Quality management system ISO 9001 or equivalentTechnical
Environmental management system ISO 14001 or equivalentTechnical
Information security ISO 27001 or equivalentTechnical
VCA certificate or equivalentTechnical
Core competenciesTechnical
Financial · 1
Professional liability insuranceFinancial

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria weighting

price 30%quality 70%
Homogeneous unit (%) · sum 100% · gate passed

07Process & timeline

Award
juni 2026
First group of piezometers converted to telemetry and start of data subscription
1 november 2026
New tender (intended award)
juni 2033
First piezometers under new Agreement provided with new equipment
1 november 2033

08Value in context

€11,000,000

09Likely competitors

#Likely bidderFitWins
1Dustin Netherlands B.V.SME8012×
2Haskoning Nederland B.V.SME73
3Orange Cyberdefense Netherlands B.V.SME73
4Vodafone Libertel B.V.SME73
5Antea Nederland BVSME73
6DAT.Mobility B.V.SME71

10Tender documents

Bijlage 08 Model holdingverklaring - garantieverklaring.docxdocxApr 1, 2026 · 69 KB
Bijlage E Bonusmalusregeling nvi HERZIEN.pdfpdfApr 1, 2026 · 182 KB
Bijlage 03 UEA.pdfpdfApr 1, 2026 · 301 KB
Bijlage F Beoordeling SGC en scoreberekening Kwaliteit.pdfpdfApr 1, 2026 · 134 KB
Bijlage 05 Verklaring inzake VERORDENING (EU) 2022-576.docxdocxApr 1, 2026 · 68 KB
Bijlage 07 Model referentieopdrachten voor kerncompetenties.docxdocxApr 1, 2026 · 70 KB
Bijlage I Algemene Inkoopvoorwaarden voor leveringen en diensten.pdfpdfApr 1, 2026 · 215 KB
Inschrijvingsfase.pdfpdfApr 1, 2026 · 19 KB
Bijlage 04 Model verklaring beroep op derde(n).docxdocxApr 1, 2026 · 67 KB
Bijlage H Procedure loting .pdfpdfApr 1, 2026 · 185 KB
Bijlage 06 Model K.docxdocxApr 1, 2026 · 57 KB
Inschrijven indiening voor uitsluitingsgronden, geschiktheidseisen, uitvoeringsvoorwaarden, eisen, wensen en kwalitatieve Gunningscriteria.pdfpdfApr 1, 2026 · 49 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the expected size of the groundwater monitoring network during the contract period?
At the start of the contract, it involves approximately 2,500 existing piezometers. During the term, it is expected that the number of measuring points will increase by approximately 250 piezometers due to expansions in newly developed areas or new project-based monitoring networks.
What is the term of the agreement for the telemetry management?
The agreement for the management of the telemetry groundwater level measurements has a term of 7 years, running from 2026 through 2033.
Which technical activities fall under the scope of the assignment?
The assignment includes the installation of telemetry equipment, referential configuration, firmware updates, and real-time data integration for the piezometers. Additionally, the supplier must provide an implementation plan for adding and decommissioning measuring points.
What operational requirements must the supplier meet?
The supplier must have continuous service level agreements (SLAs) for the uptime and data integrity of the monitoring network. Furthermore, the execution must comply with Waternet IT standards and relevant national regulations.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 327K
median
€ 800K
p75
€ 2,5 mln
€ 11 mln

Gegunde waarden in CPV 72 · diensten n=1436