OpenWorksSME-friendlyRestrictedGreen

Technical installations (E&W) new construction ambulance station with office in Breda

RAV Brabant Midden-West-Noord · Restricted · 2 lots · 407845
Type
Works
45300000
Estimated value
Not published
To deadline
-120d
Feb 16, 2026 · 11:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Promising — consider biddingconfidence moderate

This document contains the technical program of requirements for the new construction of an ambulance station in Breda, with specific guidelines for building physics, installation, and fire safety requirements.

Works · Restricted · National procedure · SME-friendly

SME-friendlySustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
February 16, 2026
11:00
Scope
National
National procedure
Lots
2
2 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendlyGreen / SPPTechnical installationsMaintenance of installations

01What is being requested

Realization of a new construction ambulance station in Breda, including office environment and garage, where specific building physics, fire safety, and installation technology requirements must be met.

The assignment is divided into two lots: - contracting one E-installer - contracting one W-installer In addition, a maintenance agreement will be concluded for each lot for a period of 10 years.

45300000Works
1Electrotechnical works
2Mechanical engineering works

02Breakdown by lot

Electrotechnical worksn/a
Mechanical engineering worksn/a

Per-lot values not published — bars show only the lot breakdown.

03Strategic insight

Strategic insight · AI analysis
Ensure an integrated design that meets the Gezonde Kantoren ambitions. Pay extra attention to the air quality and the specific requirements for the garage environment. Verify the building physics quality using the prescribed calculation methods and standards.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 8
Comply with class B of the Programma van Eisen Gezonde Kantoren 2021.Important
The garage must be realized on the ground floor.Important
Account must be taken of a 24/7 function of the building.Important
The reflection factor of the exterior (including glazing) has a maximum of 0.15.Important
For workstations with a depth of more than 5 meters, class C applies for daylight.Important
The CO2 concentration in occupied spaces may not exceed 950 ppm.Important
In the garage, the air must be fully refreshed at least twice per hour.Important
Preparatory provisions for exhaust gas extraction must be made in the garage.Important

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9873×
2Croonwolter&dros B.V.SME9825×
3SPIE Nederland B.V.SME9423×
4BAM Bouw en Techniek bvSME9434×
5Heijmans Utiliteit B.V.SME9327×
6Unica Installatietechniek B.V.SME9113×

07Tender documents

Bijlage 4 Referentieopdracht P2docxJan 28, 2026 · 132 KB
NvI selectiefase E-installatiesxlsxJan 28, 2026 · 28 KB
Bijlage 4 Referentieopdracht P1docxJan 28, 2026 · 133 KB
NvI selectiefase E- & W-installatiesxlsxJan 28, 2026 · 24 KB
Selectiedocument Technische installaties (perceel 1 en 2)pdfJan 12, 2026 · 398 KB
uea_566062_20260112101208pdfJan 12, 2026 · 330 KB
Bijlage 3 - Technisch programma van eisenpdfJan 12, 2026 · 1064 KB
Bijlage 5 - Klachtenregeling Aanbestedingen Het Service CentrumpdfJan 12, 2026 · 160 KB
Bijlage 6 - UAV 2012pdfJan 12, 2026 · 1772 KB
Bijlage 2 - Concept prestatie technische omschrijvingpdfJan 12, 2026 · 753 KB
Bijlage 1 - Voorlopig ontwerppdfJan 12, 2026 · 9964 KB
TN566062 - EFE3 Vrijwillige aankondiging van een opdracht 20260112135314pdfJan 12, 2026 · 147 KB

08Legal themes that may be relevant here

09Frequently asked questions

What does the maintenance component of the assignment entail?
In addition to the installation of the technical installations, a maintenance agreement with a term of 10 years will be concluded for each lot.
Into which technical disciplines is the assignment divided?
The assignment is divided into two specific types of work: electrotechnical installations (E-installation) and mechanical installations (W-installation).
Which technical requirements apply to the installations?
The installations must comply with the Technisch Programma van Eisen (TPvE), which includes requirements for, among other things, climate installations, sanitary, sewerage, electrotechnical installations, and communication/security.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159