AwardedSuppliesEuropeanOpen

Weirs Waterbloem and Broekhuizerbroek

Waterschap Limburg · Open · 304162
Type
Supplies
44200000
Estimated value
€ 277K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Waterschap Limburg has launched an open tender for the supply of 18 weirs (sluices) for two projects within the province. The 14 weirs for the project Natte Natuur Parel Waterbloem/wateraanvoer Neer and the 4 weirs for the project Natte Natuur Parel Broekhuizerbroek must be delivered in functional condition, including all necessary components except for the LMX components, which will be supplied via direct procurement by WL. Delivery is scheduled for Q4 2023 and Q1/Q2 2024. In addition to the supply, the supplier must deploy personnel to install the weirs on-site and to support the civil contractor. The weirs must comply with the water board's automation, measuring system, and telemetry specifications, and the delivery must be fully operational.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
€276,763
awarded value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 44SuppliesEU tenderweirswaterbloembroekhuizerbroek

01What is being requested

Waterschap Limburg has launched an open tender for the supply of 18 weirs (sluices) for two projects within the province. The 14 weirs for the project Natte Natuur Parel Waterbloem/wateraanvoer Neer and the 4 weirs for the project Natte Natuur Parel Broekhuizerbroek must be delivered in functional condition, including all necessary components except for the LMX components, which will be supplied via direct procurement by WL. Delivery is scheduled for Q4 2023 and Q1/Q2 2024. In addition to the supply, the supplier must deploy personnel to install the weirs on-site and to support the civil contractor. The weirs must comply with the water board's automation, measuring system, and telemetry specifications, and the delivery must be fully operational.

The supply of 18 weirs, including necessary elements (excluding LMX components, which are supplied via direct procurement by WL) for automation, the measuring system, and telemetry to the civil contractors for the execution of two projects within the province of Limburg in Q4 2023 and Q1/Q2 2024. This concerns 14 weirs for the project Natte Natuur Parel Waterbloem/wateraanvoer Neer and 4 weirs for the project Natte Natuur Parel Broekhuizerbroek. The weirs must be delivered in functional condition, provided that the delivery from WL is fully delivered and functional. In addition to the supply,

44200000Supplies

02Outcome

Awarded

Modderkolk Projects & Maintenance B.V.

Award value
€276,763
Bidders
2

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Technische Unie B.V.SME74
2H.C. Waterbeheersing B.V.SME71
3HC WaterbeheersingUnknown67
4Modderkolk Projects & Maintenance B.V.SME67
5Eriks B.V.SME63
6Georg Fischer N.V.SME61

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the contract regarding the weirs?
The contract concerns the supply of 18 weirs for two projects: 14 weirs for the project Natte Natuur Parel Waterbloem/wateraanvoer Neer and 4 weirs for the project Natte Natuur Parel Broekhuizerbroek.
What does the delivery obligation for the weirs entail?
The weirs must be delivered in functional condition, including all necessary components for automation, the measuring system, and telemetry. The LMX components will be supplied via direct procurement by the contracting authority.
What support is expected from the supplier during installation?
In addition to the supply of the weirs, the deployment of the supplier's personnel is intended to install the weirs on-site and to support the civil contractor during execution.
During which period will the delivery and installation take place?
The delivery of the weirs is scheduled for the fourth quarter of 2023 and the first or second quarter of 2024.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 393K
median
€ 1,0 mln
p75
€ 5,0 mln
€ 277K

Gegunde waarden in CPV 44 · leveringen n=425