Study phase Merwede-Lingelijn crossing Nieuwe Waarden Alblasserwaard
Study phase for the investigation into the realization of a Merwede-Lingelijn crossing within the Nieuwe Waarden Alblasserwaard project. ProRail will be advised on the design of a preferred variant. The dossier must ensure integral quality and transferability so that ProRail can grant acceptance. The procedure is a negotiated procedure without prior publication due to the lack of competition or the unique nature of the assignment.
Services · Onderhandeling zonder bekendmaking · European procedure
01What is being requested
Study phase for the investigation into the realization of a Merwede-Lingelijn crossing within the Nieuwe Waarden Alblasserwaard project. ProRail will be advised on the design of a preferred variant. The dossier must ensure integral quality and transferability so that ProRail can grant acceptance. The procedure is a negotiated procedure without prior publication due to the lack of competition or the unique nature of the assignment.
Study phase to conduct an investigation into the realization of a crossing of the Merwede-Lingelijn for the benefit of the Nieuwe Waarden Alblasserwaard project. In the study phase, ProRail will advise on the elaboration of the design of the designed preferred variant. The study phase will be concluded with the delivery of an integral transfer dossier to ProRail, such that it is of sufficient quality and integrity, so that ProRail can accept the transfer dossier for the purpose of the procurement and realization phase. The contracting authority is applying the negotiated procedure without prio
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of the study phase for the Merwede-Lingelijn crossing?
What is the intended outcome of the study phase with respect to ProRail?
What is the role of ProRail within this investigation?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 341K
€ 992K
€ 6,5 mln
Gegunde waarden in CPV 71 · diensten n=2713