Stations - Lift and Escalator Replacement Programme, Tranche 3 part 2

ProRail B.V. · Restricted · 1 lots · 312136
Type
Works
45200000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

ProRail B.V. is implementing a programme to replace lifts and escalators at various stations due to the end of their service life. The assignment is divided into tranches; Tranche 3 part 2 concerns the replacement at four stations: Diemen Zuid (1 lift), Gouda Goverwelle (2 lifts), Woerden (4 lifts) and Zwijndrecht (3 lifts). In addition to the replacement, where the structural situation permits, the lift shaft must be made as transparent as possible. It concerns a works contract via a non-public procedure, in which the contracting authority works closely with the contractors to ensure safety and accessibility standards and to coordinate the works with the existing station network. The assignment requires a combination of building, technical and logistical expertise, with attention to minimal disruption to station traffic.

Works · Restricted · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPlift replacementescalator replacementProRail

01What is being requested

ProRail B.V. is implementing a programme to replace lifts and escalators at various stations due to the end of their service life. The assignment is divided into tranches; Tranche 3 part 2 concerns the replacement at four stations: Diemen Zuid (1 lift), Gouda Goverwelle (2 lifts), Woerden (4 lifts) and Zwijndrecht (3 lifts). In addition to the replacement, where the structural situation permits, the lift shaft must be made as transparent as possible. It concerns a works contract via a non-public procedure, in which the contracting authority works closely with the contractors to ensure safety and accessibility standards and to coordinate the works with the existing station network. The assignment requires a combination of building, technical and logistical expertise, with attention to minimal disruption to station traffic.

In the coming years, lifts and escalators at several station locations must be replaced with new ones, as they are reaching the end of their service life. Furthermore, for the lift replacements, if the structural situation permits, the lift shafts are to be made as transparent as possible. Because the funding for the lift replacements is not requested and released all at once, the Programme is divided into Tranches. Tranche 3 part 2 consists of:

45200000Works
1Stations - Lift and Escalator Replacement Programme, Tranche 3 part 2

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME9731×
2Anton Rail & Infra B.V.SME9521×
3BAM Infra B.V.SME9477×
4KWS Infra B.V.SME9392×
5Dura Vermeer Infra Regionale Projecten BVSME9358×
6Strukton Rail Nederland bvSME9234×

04Tender documents

aanmelding TN432680zipOct 4, 2023 · 2161 KB
TN432680 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20231004141059pdfOct 4, 2023 · 11 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific scope of the replacement in Tranche 3 part 2?
The assignment includes the replacement of lifts at the following stations: Diemen Zuid (1XL), Gouda Goverwelle (2XL), Woerden (4XL) and Zwijndrecht (3XL).
What additional requirements are imposed on the execution of the lifts?
For the lift replacements, the lift shafts must be made as transparent as possible, provided the structural situation allows for this.
What is the expected schedule for the works at Diemen Zuid?
The replacement of the lift at Diemen Zuid station is scheduled for the year 2025.
Why is the replacement programme divided into tranches?
The programme is divided into tranches because the budget for the replacement of the lifts is not requested and released all at once.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159