Selection of Building Works National Holocaust Museum Amsterdam
The tender concerns building works for the National Holocaust Museum Amsterdam, carried out by Stichting Hollandsche Schouwburg. The contracting authority wishes to make both buildings suitable for final operation, whereby various building technical requirements must be met. The contractor is involved early in the project so that design and execution can be optimally coordinated. Through collaboration with architects and advisors, the design is further developed in BIM into a technical design. The goal is to prevent additional work, limit costs, and shorten the lead time. The procedure is public and focused on an integrated process during the DO phase.
Works · Open · National procedure
01What is being requested
The tender concerns building works for the National Holocaust Museum Amsterdam, carried out by Stichting Hollandsche Schouwburg. The contracting authority wishes to make both buildings suitable for final operation, whereby various building technical requirements must be met. The contractor is involved early in the project so that design and execution can be optimally coordinated. Through collaboration with architects and advisors, the design is further developed in BIM into a technical design. The goal is to prevent additional work, limit costs, and shorten the lead time. The procedure is public and focused on an integrated process during the DO phase.
The tender to be submitted is for the works surrounding the realization of the National Holocaust Museum. To make both buildings suitable for final operation, the various parts must also meet different building technical requirements. [line break] To allow for an integrated process, the contractor is involved early in the project. In this way, optimal coordination of design and execution, effective transfer of information, and efficient reuse of information in the chain can be realized. We trust that this will exclude additional work, limit costs as much as possible, and shorten the total lea
02Outcome
Bouwbedrijf M.J. de Nijs & Zonen
03Value in context
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of the early involvement of the contractor in this project?
In what way is the design further developed during the DO phase?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159