RWZI Echten: Renovation of Aeration and Propulsion

Waterschap Drents Overijsselse Delta · Open · 1 lots · 331177
Type
Works
45232420
Estimated value
€ 3,70M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This project concerns the renovation of the aeration, propulsion, and recirculation system of the RWZI Echten. The contracting authority, Waterschap Drents Overijsselse Delta, has opted for a construction team agreement to leverage knowledge gained during the construction team phase in the realization phase. The contractor must develop the preferred alternative into an integrated execution design, realize the design, and complete the project within the prescribed conversion period. The focus lies on the replacement and renewal of the activated sludge system, including all subsystems, and on effective coordination between the contracting authority and the project.

Works · Open · European procedure

European
Contract type
Works
Open
Estimated value
€3,700,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderaerationpropulsionactivated sludge system

01What is being requested

This project concerns the renovation of the aeration, propulsion, and recirculation system of the RWZI Echten. The contracting authority, Waterschap Drents Overijsselse Delta, has opted for a construction team agreement to leverage knowledge gained during the construction team phase in the realization phase. The contractor must develop the preferred alternative into an integrated execution design, realize the design, and complete the project within the prescribed conversion period. The focus lies on the replacement and renewal of the activated sludge system, including all subsystems, and on effective coordination between the contracting authority and the project.

WDODelta has chosen a construction team agreement as the contract form. With this, they intend to apply the knowledge acquired during the construction team phase in the realization phase. Through this, WDODelta hopes to contract a contractor who understands and comprehends the various interests of the contracting authority and the project, and who can coordinate these effectively as a central point of contact. The assignment for the replacement and renewal of the activated sludge system consists of the following main components: [newline] - Going through a joint construction team phase to de

45232420€ 3,70MWorks
1RWZI Echten: Renovation of Aeration and Propulsion€3,700,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€3,700,000

04Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9673×
2Boskalis Nederland B.V.SME9669×
3KWS Infra B.V.SME9592×
4BAM Infra B.V.SME9577×
5Van Gelder BVSME9553×
6Heijmans Infra B.V.SME9565×

05Legal themes that may be relevant here

06Frequently asked questions

What is the chosen contract form for this assignment?
A construction team agreement has been chosen. In this model, the knowledge acquired during the construction team phase is utilized during the realization phase.
What does the assignment for the renovation of RWZI Echten entail?
The assignment includes the replacement and renewal of the aeration system, the propulsion system, and the recirculation system of the activated sludge system.
What is the role of the contractor during the construction team phase?
The contractor works jointly in the construction team phase to develop the preferred alternative into an integrated execution design for the realization phase.
What responsibility does the contractor have during realization?
The contractor is responsible for the construction and realization of the integrated execution design and for completing the project within the prescribed conversion period.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,7 mln

Gegunde waarden in CPV 45 · werken n=3159