ClosedWorksRestricted

Sewer Replacement Kroonse Wal

Gemeente Arnhem · Restricted · 363034
Type
Works
45232400
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

This project concerns the replacement of sewerage and the construction of pumping stations in Arnhem with a duration of 24 months. The award takes place on the basis of quality and price.

Works · Restricted · National procedure

Complete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Execution of sewer replacement, the installation of manholes, trench formwork, closed face boreholes, and the construction of a sewage pumping station. The contract also includes the renovation of an existing pumping station and various street and asphalt works with a duration of 24 months.

The project is characterized by a large drainage area with a concrete transport sewer 300 mm at a depth of 3-5 meters below ground level. Above this transport sewer, there is locally a parallel sewer for the necessary manhole and house connections. In combination with a groundwater level of 1.25 m below ground level, many sewers from various streets are connected at a low level to the deep and poorly maintained transport sewer. The sewer task therefore involves splitting the drainage areas with 3 new pumping stations and pump wells. The sewers to be removed and new sewers are mostly made of pl

45232400Works

02Strategic insight

Strategic insight · AI analysis
When preparing the quality bid, focus strongly on environmental management and the limitation of nuisance. Ensure that the reference projects exactly meet the depth requirements of 5.70 m and 6.00 m respectively. Emphasize the use of emission-free equipment to achieve the highest score on quality.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The contract requires emission-free pumping.Important
Account must be taken of a high groundwater level of 1.25 m below ground level.Important
Works take place near a culvert of the Water Board Rivierenland.Important
When employing third parties, a UEA of the subcontractor is mandatory.Important

04Can I take part?

Technical · 3
Replacement of sewerage at a depth of approx. 5 meters with a minimum invoiced amount of € 750,000 excl. VAT. The sewers vary in depth from a minimum of 2.00 m to a maximum of 5.70 m.Technical
Construction of sewer pumping stations including W + E (depth approx. 5 meters). Maximum excavation depth for pump wells is approximately 6.00 m to the top of the underwater concrete.Technical
Application of closed face boreholes (GFB) with pressure and receiving pit.Technical

05Award criteria

Sewer Replacement Kroonse Wal (Quality)60

Assessment based on cooperation, limiting nuisance, environmental management, and the use of emission-free equipment.

Sewer Replacement Kroonse Wal (Price)40

Sewer Replacement Kroonse Wal

06Process & timeline

Period for requests for additional information
16/01/2025 10:00 +01:00
Latest date for receipt of requests to participate
11/02/2025 10:00 +01:00
Expected date of dispatch of invitations to tender
03/06/2025

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9958×
2BAM Infra B.V.SME9877×
3Van Gelder BVSME9853×
4Heijmans Infra B.V.SME9865×
5KWS Infra B.V.SME9592×
6ENGIE Infra & Mobility B.V.SME9569×

09Tender documents

NvI_RVV Kroonse WalpdfJan 23, 2025 · 86 KB
Bijlage 1_Format NvI_RVV Kroonse WaldocxJan 7, 2025 · 90 KB
Selectieleidraad_RVV Kroonse Wal (2)pdfJan 7, 2025 · 359 KB
uea_496612_20250102135017pdfJan 7, 2025 · 1621 KB
TN496612 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250107134613pdfJan 7, 2025 · 9 KB
Bijlage 4_Inschrijvingsformulier Referentieprojecten GeschiktheidseisendocxJan 7, 2025 · 48 KB
Bijlage 3_Verklaring Beroep op DerdendocxJan 7, 2025 · 29 KB

10Legal themes that may be relevant here

11Frequently asked questions

What does the technical scope of the project Sewer Replacement Kroonse Wal entail?
The contract includes splitting the drainage areas with 3 new pumping stations and pump wells. Works include, among other things, the replacement of approximately 2,300 m1 of sewer at a depth of 3-5 meters, the installation of approximately 75 manholes, approximately 2,000 m1 of trench formwork, and the construction of 2 closed face boreholes with pressure and receiving pits.
What specific adjustments are needed to the existing pumping station?
Pumping station De Laar West must be adapted in terms of appendages. The new incoming sewer connects at a greater depth to the receiving chamber to be adapted.
Which materials are used for the sewer works?
The sewers to be removed and new sewers are mostly made of plastic, but concrete pipes are also included in the scope of the contract.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159