Sewerage construction and redesign Dordsestraat Phase 1
The Municipality of Emmen intends to construct a large rainwater sewer in the Dordsestraat that connects to existing stormwater networks in the Emmalaan and Boermarkeweg and to the Bargermeerkanaal. The construction also includes foul water sewerage and drilling works beneath the existing railway. Simultaneously, the traffic structure of the Dordsestraat will be adjusted. The assignment requires an integrated design and execution approach that complies with water management and railway safety standards, with attention to environmental impact, traffic safety, and minimal disruption to the railway line. The contractor must present a technical, financial, and environmentally friendly plan, including a detailed schedule, risk analysis, and measures for the protection of the railway and the surrounding environment.
Works · Open · European procedure
01What is being requested
The Municipality of Emmen intends to construct a large rainwater sewer in the Dordsestraat that connects to existing stormwater networks in the Emmalaan and Boermarkeweg and to the Bargermeerkanaal. The construction also includes foul water sewerage and drilling works beneath the existing railway. Simultaneously, the traffic structure of the Dordsestraat will be adjusted. The assignment requires an integrated design and execution approach that complies with water management and railway safety standards, with attention to environmental impact, traffic safety, and minimal disruption to the railway line. The contractor must present a technical, financial, and environmentally friendly plan, including a detailed schedule, risk analysis, and measures for the protection of the railway and the surrounding environment.
In Emmen's total rainwater structure plan, the connection to the Bargermeerkanaal forms an important link. In this context, the Municipality of Emmen intends to construct a large rainwater sewer in the Dordsestraat and connect it to previously constructed rainwater sewers in the Emmalaan and the Boermarkeweg. Foul water sewerage will also be installed in the same area. As part of the construction of the new sewerage, a sewer must also be drilled under the existing railway line.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the specific scope of the sewerage works in the Dordsestraat?
What technical works will take place under the railway line?
Will the infrastructure in the Dordsestraat be further adjusted?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln