AwardedWorksEuropeanOpen

Sewerage construction and redesign Dordsestraat Phase 1

Gemeente Emmen · Open · 1 lots · 351312
Type
Works
45232400
Estimated value
€ 3,50M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Emmen intends to construct a large rainwater sewer in the Dordsestraat that connects to existing stormwater networks in the Emmalaan and Boermarkeweg and to the Bargermeerkanaal. The construction also includes foul water sewerage and drilling works beneath the existing railway. Simultaneously, the traffic structure of the Dordsestraat will be adjusted. The assignment requires an integrated design and execution approach that complies with water management and railway safety standards, with attention to environmental impact, traffic safety, and minimal disruption to the railway line. The contractor must present a technical, financial, and environmentally friendly plan, including a detailed schedule, risk analysis, and measures for the protection of the railway and the surrounding environment.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€3,500,000
estimated value
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendersewerage constructionrainwaterrailway

01What is being requested

The Municipality of Emmen intends to construct a large rainwater sewer in the Dordsestraat that connects to existing stormwater networks in the Emmalaan and Boermarkeweg and to the Bargermeerkanaal. The construction also includes foul water sewerage and drilling works beneath the existing railway. Simultaneously, the traffic structure of the Dordsestraat will be adjusted. The assignment requires an integrated design and execution approach that complies with water management and railway safety standards, with attention to environmental impact, traffic safety, and minimal disruption to the railway line. The contractor must present a technical, financial, and environmentally friendly plan, including a detailed schedule, risk analysis, and measures for the protection of the railway and the surrounding environment.

In Emmen's total rainwater structure plan, the connection to the Bargermeerkanaal forms an important link. In this context, the Municipality of Emmen intends to construct a large rainwater sewer in the Dordsestraat and connect it to previously constructed rainwater sewers in the Emmalaan and the Boermarkeweg. Foul water sewerage will also be installed in the same area. As part of the construction of the new sewerage, a sewer must also be drilled under the existing railway line.

45232400€ 3,50MWorks
1Sewerage construction and redesign Dordsestraat Phase 1€3,500,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€3,500,000

04Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME9792×
2BAM Infra B.V.SME9677×
3Dura Vermeer Infra Regionale Projecten BVSME9658×
4Van Gelder BVSME9553×
5Heijmans Infra B.V.SME9565×
6Boskalis Nederland B.V.SME9569×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific scope of the sewerage works in the Dordsestraat?
The assignment includes the construction of a large rainwater sewer that will be connected to existing rainwater sewers in the Emmalaan and the Boermarkeweg, as well as a connection to the Bargermeerkanaal. Additionally, foul water sewerage will be installed.
What technical works will take place under the railway line?
As part of the construction of the new sewerage, a sewer must be drilled under the existing railway.
Will the infrastructure in the Dordsestraat be further adjusted?
Yes, simultaneously with the construction of the sewerage, the traffic structure of the Dordsestraat will also be adjusted.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,5 mln

Gegunde waarden in CPV 45 · werken n=3159