Request for Qualifications: Saba Renewable Energy Phase 3 Project - Solar PV with Battery Energy Storage System Engineering, Procurement and Construction for Saba Electric Company
Saba Electric Company N.V. (SEC) is launching a Request for Qualifications (RfQ) for Engineering, Procurement and Construction (EPC) of a utility-scale, ground-mounted solar PV installation with a battery energy storage system (BESS). The project, located on a 34,530 m² area in Giles Quarters, Saba, has an estimated capacity of 2 MW PV and 7.2 MWh BESS. The interconnection with the local grid can be achieved by extending the existing Feeder #3 by 1 km or by installing a new 2–3 km 12 kV line from Feeder #4. The RfQ is a non-public procedure aimed at selecting a qualified EPC partner with experience in similar projects, local regulations, and providing a fully integrated solution including design, procurement, construction, testing, and commissioning. SEC expects detailed qualification documentation, references, technical and financial capacity, and a clear approach to project management, safety, and environmental compliance.
Works · Restricted · National procedure
01What is being requested
Saba Electric Company N.V. (SEC) is launching a Request for Qualifications (RfQ) for Engineering, Procurement and Construction (EPC) of a utility-scale, ground-mounted solar PV installation with a battery energy storage system (BESS). The project, located on a 34,530 m² area in Giles Quarters, Saba, has an estimated capacity of 2 MW PV and 7.2 MWh BESS. The interconnection with the local grid can be achieved by extending the existing Feeder #3 by 1 km or by installing a new 2–3 km 12 kV line from Feeder #4. The RfQ is a non-public procedure aimed at selecting a qualified EPC partner with experience in similar projects, local regulations, and providing a fully integrated solution including design, procurement, construction, testing, and commissioning. SEC expects detailed qualification documentation, references, technical and financial capacity, and a clear approach to project management, safety, and environmental compliance.
Saba Electric Company N.V. (SEC) is issuing this Request for Qualifications for interested parties to provide information to qualify for an upcoming tender for Engineering, Procurement, and Construction services for a utility-scale ground-mounted solar PV plant with battery energy storage system (BESS) project at Giles Quarters, Saba. The approximate plant capacities are 2MW solar and 7.2MWh BESS. The proposed Phase 3 solar PV with BESS renewable energy plant will be located on a 34,530 square meter site at Giles Quarter. It will be interconnected to the Saba grid either by extending existing
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Tender documents
05Legal themes that may be relevant here
06Frequently asked questions
What is the technical scope of the solar energy project?
What does the requested assignment for the EPC partner entail?
How will the solar energy installation be connected to the electricity grid?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159