Uniper Benelux N.V. intends to prepare an existing Frame 9/E gas turbine with generator at the RoCa3 location in Rotterdam for a transition from low-caloric to high-caloric gas fuel. Instead of only replacing the fuel nozzles, a new combustion system (DLN-1) will be installed that meets low emission standards and offers the possibility to use up to 30% hydrogen. The works will be carried out during an existing inspection period, thereby limiting the lead time. The assignment requires a high-quality technical system that is compatible with the current turbine, meets safety and performance criteria, and complies with Dutch and European regulations regarding emissions and hydrogen use. Suppliers must have experience with gas turbine systems, hydrogen integration, and emission reduction, and can provide complete installation, testing, documentation, and training.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
Uniper Benelux N.V. intends to prepare an existing Frame 9/E gas turbine with generator at the RoCa3 location in Rotterdam for a transition from low-caloric to high-caloric gas fuel. Instead of only replacing the fuel nozzles, a new combustion system (DLN-1) will be installed that meets low emission standards and offers the possibility to use up to 30% hydrogen. The works will be carried out during an existing inspection period, thereby limiting the lead time. The assignment requires a high-quality technical system that is compatible with the current turbine, meets safety and performance criteria, and complies with Dutch and European regulations regarding emissions and hydrogen use. Suppliers must have experience with gas turbine systems, hydrogen integration, and emission reduction, and can provide complete installation, testing, documentation, and training.
On our Uniper Benelux (UBX) location RoCa3 at Rotterdam we have stationed a Frame9/E gas turbine with generator. In 2023 there is a change from Low Caloric Gas to High Caloric Gas planned for the unit. Instead of only changing the fuel nozzles we want to prepare the unit for the future with emission reduction and the possibility to run partly on Hydrogen. During the available time of a Combustion Inspection we want to have replaced the existing DLN-1 system with a new Combustion System together with fuel nozzles that are ready for High Caloric Gas, low emissions and the possibility to run at a
02Outcome
Thomassen Energy B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the purpose of the combustion system replacement?
What fuel possibilities does the new combustion system offer?
When will the works on the gas turbine be carried out?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159