AwardedWorksEuropeanRestricted

Renovation Emergency Department

Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Leids Universitair Medisch Centrum (LUMC) intends to select one contractor via an EU non-open procedure for the renovation of the Emergency Department. The assignment concerns a works contract in which the contractor is responsible for the design, execution, and delivery of a fully renovated emergency department, including infrastructure, medical equipment, and supporting facilities. The procurement follows the non-open procedure with a selection and award phase, in which the LUMC first creates a shortlist and subsequently makes an award. The contractor must meet strict requirements regarding safety, hygiene, minimal disruption to daily care, and a clear schedule. The contract duration is approximately 18 to 24 months, with a delivery period of 12 to 18 months. The LUMC expects transparent pricing, a detailed project plan, and solid experience in hospital renovations.

Works · Restricted · European procedure

European
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderrenovationemergency departmentLUMC

01What is being requested

The Leids Universitair Medisch Centrum (LUMC) intends to select one contractor via an EU non-open procedure for the renovation of the Emergency Department. The assignment concerns a works contract in which the contractor is responsible for the design, execution, and delivery of a fully renovated emergency department, including infrastructure, medical equipment, and supporting facilities. The procurement follows the non-open procedure with a selection and award phase, in which the LUMC first creates a shortlist and subsequently makes an award. The contractor must meet strict requirements regarding safety, hygiene, minimal disruption to daily care, and a clear schedule. The contract duration is approximately 18 to 24 months, with a delivery period of 12 to 18 months. The LUMC expects transparent pricing, a detailed project plan, and solid experience in hospital renovations.

This concerns the EU non-open procurement by the LUMC for entering into an Agreement with one Contractor for the renovation of the Emergency Department of the LUMC. The procurement is conducted according to the non-open procedure (the non-open procedure is a procurement procedure in which a distinction is made between a selection phase and an award phase) in accordance with the European Directive for public procurement 2014/25/EU.

45000000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Heijmans Utiliteit B.V.SME10027×
2Croonwolter&dros B.V.SME9625×
3Unica Installatietechniek B.V.SME9113×
4J.P. van Eesteren B.V.SME8812×
5Visser & Smit Bouw bvSME8611×
6Constructif B.V.SME8312×

05Tender documents

TN371665 - SF03 Aankondiging van een gegunde opdracht 20230319115952pdfMar 19, 2023 · 25 KB
TN371665 - SF02 Aankondiging van een opdracht 20220729094501pdfJul 29, 2022 · 28 KB

06Legal themes that may be relevant here

07Frequently asked questions

What does the assignment for the renovation of the Emergency Department entail?
The assignment includes the design, execution, and delivery of a fully renovated emergency department, including the infrastructure, medical equipment, and supporting facilities.
What is the expected duration of the works?
The contract duration is approximately 18 to 24 months, with a specific delivery period of 12 to 18 months.
Which requirements must the contractor meet during the renovation?
The contractor must meet strict requirements regarding safety, hygiene, minimal disruption to daily care, and a clear schedule.
What is expected of the contractor regarding project management?
The contractor is expected to be able to provide transparent pricing, a detailed project plan, and solid experience in hospital renovations.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159