Renovation Kadoelerbrug

Gemeente Noordoostpolder · Restricted · 1 lots · 347675
Type
Works
45000000
Estimated value
€ 4,80M
estimated
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
5 criteria
Assess manuallyconfidence high

Renovation of the movable Kadoelerbrug by the Municipality of Noordoostpolder via a construction team procedure. The assignment consists of a design and realization phase within a target budget.

Works · Restricted · National procedure

Sustainability countsComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
€4,800,000
estimated value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPP

01What is being requested

Renovation of the Kadoelerbrug, consisting of a movable part and approach bridges. The assignment includes both the construction team phase and the realization phase until September 2026.

The Municipality of Noordoostpolder manages a large area of bridges, including five movable bridges. The Kadoelerbrug is one of those movable bridges and is in need of renovation. Together with the Kadoelerkeersluis, the Kadoelerbrug forms one complex. The complex was built in 1940. The keersluis belongs to Waterschap Zuiderzeeland and the bridge to the Municipality of Noordoostpolder. Only the Kadoelerbrug is part of the assignment. The Kadoelerbrug consists of a movable part and approach bridges. The contracting authority is looking for a contractor who actively participates in the construc

45000000€ 4,80MWorks
1Renovation Kadoelerbrug€4,800,000

02Strategic insight

Strategic insight · AI analysis
Ensure demonstrable experience with the integral combination of civil engineering, W-installations, and E&IA. Focus on the construction team phase as the winner will directly perform the realization. Note the budgetary frameworks set for both the design and the works.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 3
The contractor in the construction team is the intended party for the realization.Important
A target budget is used for both the construction team and the works.Important
In the case of a partnership, the lowest level of the participants is used for the score.Important

04Can I take part?

Technical · 8
S1 SC1 Core competence UO renovation Civil part movable bridge: developing an execution design of the civil part of a renovation of a movable bridge with a contract sum or invoiced amount of at least € 0.5 million, excl. VAT.Technical
S2 SC2 Core competence realization renovation Civil part movable bridge: realizing the civil part of a renovation of a movable bridge with a contract sum or invoiced amount of at least € 0.5 million, excl. VAT.Technical
S3 SC3 Core competence construction team: experience with participation in a construction team as main contractor of a work in civil engineering (GWW) with a contract sum or invoiced amount of at least € 2.5 million, excl. VAT.Technical
S4 SC4 Core competence construction team movable bridge: experience with participation in a construction team as main contractor of a movable bridge (renovation or new construction) with a contract sum or invoiced amount of at least € 2.5 million, excl. VAT.Technical
S5 SC5 Core competencies integral (C, W and E&IA): experience as main contractor with an assignment in which both civil, W-installation and E&IA core competencies in nature and scope were performed within one work.Technical
S6 SC6 CO2 performance ladder: score based on the CO2-Prestatieladder 3.1 (maximum level 5).Technical
S7 SC7 Environmental management system ISO norm 14001: possession of a valid environmental certificate in accordance with ISO 14001 or equivalent.Technical
S8 SC8 Safety Culture Ladder (SCL): score based on the NEN Safety Culture Ladder (maximum level 5).Technical

05Award criteria

GC 1 Plan of approach integral cooperation in the construction team and realization phase30

Plan of approach for integral cooperation.

GC 2 Plan for establishing the price offer for the execution phase20

Plan for the price offer in the execution phase.

GC4 Technical design risks15

Assessment of technical design risks.

GC 3 Vision on sustainability15

Vision on sustainability.

Price20

Hourly rates construction team.

06Process & timeline

Requests for additional information
16/09/2024 12:00 +02:00
Deadline for receipt of requests to participate
15/10/2024 12:00 +02:00
Estimated date of sending invitations
04/11/2024
Start date of execution
14/02/2025
End date of execution
30/09/2026

07Value in context

€4,800,000

08Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3Dura Vermeer Infra Regionale Projecten BVSME10058×
4VolkerRail Nederland B.V.SME10030×
5Heijmans Infra B.V.SME9965×
6Croonwolter&dros B.V.SME9925×

09Tender documents

TN483430 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250224135457pdfFeb 25, 2025 · 11 KB
Nota van Inlichtingen 2 - Renovatie Kadoelerbrug d.d. 1 oktober 2024pdfOct 1, 2024 · 79 KB
Nota van Inlichtingen 1 - Renovatie Kadoelerbrug d.d. 17-9-2024pdfSep 18, 2024 · 133 KB
TN483430 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240917134336pdfSep 17, 2024 · 15 KB
Selectieleidraad Kadoelerbrug_ZN 20240430124070_D1zipSep 4, 2024 · 21604 KB
TN483430 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240902171209pdfSep 4, 2024 · 15 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the setup of the cooperation between the client and the contractor?
The assignment is carried out via a construction team phase followed by a realization phase. The contractor participating in the construction team is also the intended party for the final realization of the renovation.
What are the budgetary frameworks for the different phases of the project?
There is a target budget for the preparation in the construction team of € 450,000.00 excl. VAT. For the final realization of the works, a target budget of € 4,350,000.00 excl. VAT applies.
What is the intended duration of the execution of the assignment?
The execution of the assignment, consisting of the construction team phase and the realization phase, is planned from the moment of the final award decision until 31 September 2026.
What is the scope of the Kadoelerbrug to be renovated?
The assignment concerns the renovation of the Kadoelerbrug, which consists of a movable part and approach bridges. The bridge is part of a complex with the Kadoelerkeersluis, built in 1940.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,8 mln

Gegunde waarden in CPV 45 · werken n=3159