Renovation and new construction of polder pumping stations

Waterschap Rivierenland · Open · 1 lots · 363504
Type
Works
45000000
Estimated value
€ 48M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Renovation and new construction of 18 polder pumping stations (approx. 5–250 m³/min) by Waterschap Rivierenland via a framework agreement with 2-phase agreements. The first phase includes civil, mechanical, and electrical design, project management, inventory, SSK estimation, permit applications, and coordination with the control systems. Phase 2 involves the delivery and execution of these designs, testing and commissioning, and coordinating the disciplines.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€48,000,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

Renovation and new construction of 18 polder pumping stations (approx. 5–250 m³/min) by Waterschap Rivierenland via a framework agreement with 2-phase agreements. The first phase includes civil, mechanical, and electrical design, project management, inventory, SSK estimation, permit applications, and coordination with the control systems. Phase 2 involves the delivery and execution of these designs, testing and commissioning, and coordinating the disciplines.

Waterschap Rivierenland is seeking market parties for a new framework agreement for the renovation/new construction of our existing polder pumping stations. Within this framework agreement, 2-phase agreements will be applied in subsequent agreements. The tender represents the next step in our collaboration with market parties for the Long Term Asset Planning (LTAP) program. This framework agreement aims for an efficient and effective execution of the necessary works on the polder pumping stations, with collaboration being central. The assignment concerns 18 polder pumping stations. The flow

45000000€ 48MWorks
1Renovation and new construction of polder pumping stations€48,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€48,000,000

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Heijmans Infra B.V.SME10065×
3BAM Infra B.V.SME10077×
4ENGIE Infra & Mobility B.V.SME10069×
5Ploegam B.V.SME10022×
6VolkerRail Nederland B.V.SME10030×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the assignment regarding the polder pumping stations?
The assignment concerns the renovation and new construction of 18 polder pumping stations. The flow rates of these pumping stations vary from approximately 5 m³/min for the small polder pumping stations to approximately 250 m³/min for the larger polder pumping stations.
How is the collaboration within the framework agreement structured?
Within the framework agreement for the renovation and new construction of the polder pumping stations, 2-phase agreements are applied in the subsequent agreements.
Which activities are carried out in the first phase of the agreement?
Phase 1 comprises the design and preparatory phase, consisting of civil engineering, mechanical engineering, and electrical process automation. This includes project management, inventory, drafting preliminary designs and final designs, SSK estimations, permit applications, and coordination of the automation with the water board's control systems.
What does the second phase of the agreement entail?
Phase 2 consists of the delivery and execution phase. This includes project management, converting the final design into an execution design, the realization of the execution design, testing and commissioning, and coordinating the various disciplines.
What requirements are made regarding the automation of the pumping stations?
The automation must connect to the control systems of Waterschap Rivierenland. The design of the control installation must be coordinated with the hardware software engineer of the contracting authority.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 48 mln

Gegunde waarden in CPV 45 · werken n=3159