Renovation Amsterdam Arenatunnel
This tender concerns the renovation and maintenance of the Amsterdam Arenatunnel via a Cost+ agreement in a construction team (ECI) model. The contract includes civil, building, and installation technical works over multiple phases.
Works · Competitive dialogue · European procedure
01What is being requested
The contract concerns the renovation of the Amsterdam Arenatunnel, including the replacement of installations, fire-resistant cladding, and making the tunnel closable. Additionally, the contract includes maintenance works during the renovation and for a period of four to six years after completion.
The Amsterdam Arenatunnel was commissioned in 1996 and is now due for renovation. Based on a zero-inventory, it has appeared that most existing installations require replacement (including the control system, low-voltage installation, lighting, public address system, and emergency power installation). Some installations, including the HF installation and visibility measurement, are even in very poor condition. Additionally, various repair works are necessary. The fire resistance of the tunnel must also be brought to the desired level.
02Strategic insight
Focus on intensive cooperation within the three project phases to align interests. Anticipate the open book administration required for the Cost+ methodology. Provide a plan of approach in which additional proposals for improved cooperation are made.
03Points of attention
04Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
05Process & timeline
06Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
07Likely competitors
08Tender documents
09Legal themes that may be relevant here
10Frequently asked questions
What is the specific substantive scope of the renovation?
On which methodology is the intended agreement based?
Automatically compiled from the official tender data and documents.