Reconstruction Vennewatersweg Heiloo

Gemeente Heiloo · Restricted · 1 lots · 203598
Type
Works
45233100
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Heiloo intends to fully reconstruct the Vennewatersweg because the current infrastructure no longer meets the requirements of the growing residential construction in Zandzoom. The project requires a flexible approach, in which the contractor must be able to adapt the design and execution to changing circumstances. Key points of attention are accessibility, local support, environmental management, sustainability, climate adaptation, heat stress, and water storage. The budget must be strictly controlled, while the contractor must contribute ideas regarding energy efficiency, CO2 reduction, and water management starting from the design phase. The procedure is non-public, meaning the tender is limited to a select group of potential contractors. The contracting authority expects an integrated approach in which technical, social, and ecological aspects are brought together in a single project.

Works · Restricted · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPreconstructionVennewaterswegHeiloo

01What is being requested

The Municipality of Heiloo intends to fully reconstruct the Vennewatersweg because the current infrastructure no longer meets the requirements of the growing residential construction in Zandzoom. The project requires a flexible approach, in which the contractor must be able to adapt the design and execution to changing circumstances. Key points of attention are accessibility, local support, environmental management, sustainability, climate adaptation, heat stress, and water storage. The budget must be strictly controlled, while the contractor must contribute ideas regarding energy efficiency, CO2 reduction, and water management starting from the design phase. The procedure is non-public, meaning the tender is limited to a select group of potential contractors. The contracting authority expects an integrated approach in which technical, social, and ecological aspects are brought together in a single project.

The Vennewatersweg must be reconstructed as the existing situation is no longer sufficient. For clarification, a situation sketch has been added (appendix XXX).

45233100Works
1Lot 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3Combinatie Heijmans - SWARCOUnknown10073×
4Boskalis Nederland B.V.SME10069×
5Heijmans Infra B.V.SME10065×
6Van Gelder BVSME9953×

04Tender documents

02. Nota van Inlichtingen 20200910pdfSep 10, 2020 · 172 KB
TN277729 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20200910112814pdfSep 10, 2020 · 10 KB
TN277729 - SF02 Aankondiging van een opdracht 20200826140821pdfAug 26, 2020 · 33 KB
Invulbijlagen B1 en CdocxAug 26, 2020 · 19 KB
uea_277729_20200824170328pdfAug 26, 2020 · 33 KB
Selectieleidraad niet-openbaar Vennewatersweg 20200824 DefpdfAug 26, 2020 · 448 KB
Bijlage D 19HB0403-BS-001-VO-200824-BESTAANDE SITUATIEpdfAug 26, 2020 · 1625 KB
Bijlage E StakeholderspdfAug 26, 2020 · 67 KB
Bijlage D-BESTAANDE SITUATIE MET ONTWERP VENNEWATERSWEGpdfAug 26, 2020 · 2104 KB
uea_277729_20200824170328xmlAug 26, 2020 · 126 KB

05Legal themes that may be relevant here

06Frequently asked questions

What are the most important technical aspects of the reconstruction of Vennewatersweg?
The reconstruction focuses on improving the infrastructure that no longer meets requirements. Key points of attention are accessibility from the residential developments in Zandzoom, climate adaptation, heat stress, and water storage.
What requirements are placed on the execution and the approach of the contractor?
A high degree of flexibility is required from the contractor due to a significant phasing issue. Additionally, there is attention to environmental management to create and maintain local support.
In which areas can the contractor contribute ideas during the design process?
The assignment offers opportunities to contribute ideas regarding sustainability, energy efficiency, CO2 reduction, climate adaptation, heat stress, and water management starting from the design phase.
What is the focus regarding budget management for this project?
The project requires strict budget control in combination with an integrated approach to technical, social, and ecological aspects.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159