ClosedWorksEuropean

Reconstruction of Beek-Elsloo station area

Provincie Limburg · 1 lots · 354860
Type
Works
45220000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Provincie Limburg, together with the municipalities of Beek and Stein, is carrying out a redevelopment of the Beek-Elsloo station area. The project focuses on creating a safe, multimodal hub capable of handling passenger growth and improving traffic flow. Core activities include the realization of a bus turning bay, the redevelopment of the station square with the separation of motorized and slow-moving traffic, the construction of bicycle and pedestrian connections, the traffic engineering adjustment of the Stationsstraat-Aan de drie Heren intersection, the establishment of P&R facilities and station access on the Stein side, and the opening of the crossing. The works take place on both sides of the station, between Middelweg, Stationsstraat, Aan de Drie Heren, and Sanderboutlaan. Execution starts on 31 January 2024 and ends on 19 May 2025, with a duration of 15.5 months.

Works · European procedure

European
Contracting authority
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderstation reconstructionbus bayP&R

01What is being requested

Provincie Limburg, together with the municipalities of Beek and Stein, is carrying out a redevelopment of the Beek-Elsloo station area. The project focuses on creating a safe, multimodal hub capable of handling passenger growth and improving traffic flow. Core activities include the realization of a bus turning bay, the redevelopment of the station square with the separation of motorized and slow-moving traffic, the construction of bicycle and pedestrian connections, the traffic engineering adjustment of the Stationsstraat-Aan de drie Heren intersection, the establishment of P&R facilities and station access on the Stein side, and the opening of the crossing. The works take place on both sides of the station, between Middelweg, Stationsstraat, Aan de Drie Heren, and Sanderboutlaan. Execution starts on 31 January 2024 and ends on 19 May 2025, with a duration of 15.5 months.

“Redevelopment Station Environment Beek-Elsloo” concerns a project that Provincie Limburg is carrying out together with the municipalities of Beek and Stein. Provincie Limburg and the municipalities of Beek and Stein share the ambition to revitalize station Beek-Elsloo and its surroundings so that existing bottlenecks in the station area are resolved and the station area is made future-proof, fits well into the environment, is designed logically and clearly, and encourages travel by public transport. Furthermore, the ambition is that the area is safe and has high quality of stay, and that all

45220000Works
1Reconstruction of Beek-Elsloo station area

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Den Ouden Aannemingsbedrijf B.V.SME10024×
2Combinatie Heijmans - SWARCOUnknown9673×
3Heijmans Infra B.V.SME9565×
4Dura Vermeer Infra Regionale Projecten BVSME9558×
5Strukton Rail Nederland bvSME9533×
6Gebr. van Kessel Wegenbouw B.V.SME9520×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the redevelopment of the Beek-Elsloo station area?
The project aims to revitalize the station environment to resolve bottlenecks, increase traffic safety around the Stationsstraat level crossing, and improve the quality of the multimodal hub for growing passenger numbers.
Which specific works are part of the project scope?
The scope includes, among other things, the realization of a turning possibility for buses, the redevelopment of the station square (with separation of motorized and slow-moving traffic), the construction of P&R facilities and station access on the Stein side, and the opening of the crossing.
What is the expected execution period of the works?
The execution of the works starts on 31 January 2024 and will be completed on 19 May 2025, which amounts to a total duration of 15.5 months.
In which areas will the works take place?
The works are carried out on both sides of station Beek-Elsloo, between the roads Middelweg, Stationsstraat, Aan de Drie Heren, and the Sanderboutlaan in the municipalities of Beek and Stein.

Automatically compiled from the official tender data and documents.