Reconstruction of Artificial Grass Sports Fields and Recreation Fields 2026
The Municipality of Haarlemmermeer is seeking one party for the reconstruction of three artificial grass football fields and four recreation fields in 2026. The award is based on the best price-quality ratio across all specifications collectively.
Services · Open · European procedure
01What is being requested
The contract concerns the reconstruction of three artificial grass fields (football) and four recreation fields (three small football pitches). The works include, among other things, the removal of mats and site inventory, earthworks, the installation of artificial grass fields and the re-paving of surfaces, to be realized in the period June through November 2026.
The contract for the reconstruction of artificial grass sports fields Haarlemmermeer 2026 mainly consists of: a. the temporary removal of fencing; b. the removal of site inventory; c. the removal of paving; d. the removal of artificial grass mats; e. performing earthworks; f. the installation and re-paving of surfaces; h. the installation of artificial grass fields; i. the installation of anti-root screens; j. the installation of site inventory.
02Outcome
CSC Sport
03Strategic insight
<ul Ensure a combined bid for all three lots, as participation in only two or fewer specifications leads to exclusion. Focus strongly on the qualitative substantiation of the planning and sustainability, as the total quality value (G1 and G2) can yield up to € 650,000.00 in fictitious discount on the bid sum. Ensure that the reference projects exactly meet the size requirement of at least € 600,000.00 and the term of 3 years.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
Assessment of the way the verification plan is rolled out, the effort to achieve the objective, the identification of risks and management measures, the realistic planning (including lead times for notifications/permits and delivery times) and the effectiveness of the measures. The Plan of Approach and the planning must treat all sub-projects together as one project.
Making transparent the extent to which sustainable fuels are used for the work via a table and textual explanation. Assessment takes place on the effectiveness, the degree of use, the quantification/substantiation and the demonstrability of measures regarding transport, emissions on the construction site and agreements with suppliers/subcontractors.
The total bid sum of the four specifications.
08Process & timeline
09Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
10Bidders in this segment
11Tender documents
12Legal themes that may be relevant here
13Frequently asked questions
What does the contract for the reconstruction of the sports fields specifically entail?
What is the scope of the fields to be replaced?
What technical competence must a bidder possess?
Which quality aspects are essential in the execution of this contract?
Automatically compiled from the official tender data and documents.
14Estimated value versus the market
€ 260K
€ 600K
€ 1,8 mln
Gegunde waarden in CPV 77 · diensten n=1648