Sluisjesdijk 2.0 Technical Migration Realisation Partner
Waterschap Hollandse Delta (WSHD) is seeking a realisation partner for the large-scale renovation of the Sluisjesdijk (SLDK) sludge treatment plant, known as Project Sluisjesdijk 2.0. The existing installations, built in 1986, are nearing the end of their service life. The renovation follows an integrated, step-by-step approach in which each sub-process (e.g., mechanical, E&I, civil engineering) is designed and executed within a construction team framework. The plant must remain fully operational during the works, necessitating temporary installations. For each sub-process, a final design (DO) or an extract (UO) is prepared based on a preliminary design (VO+). Subsequently, the realisation partner may submit a tender; if approved, they will be awarded the contract for that phase. Some sub-processes may be awarded outside of the construction team.
Works · Open · European procedure
01What is being requested
Waterschap Hollandse Delta (WSHD) is seeking a realisation partner for the large-scale renovation of the Sluisjesdijk (SLDK) sludge treatment plant, known as Project Sluisjesdijk 2.0. The existing installations, built in 1986, are nearing the end of their service life. The renovation follows an integrated, step-by-step approach in which each sub-process (e.g., mechanical, E&I, civil engineering) is designed and executed within a construction team framework. The plant must remain fully operational during the works, necessitating temporary installations. For each sub-process, a final design (DO) or an extract (UO) is prepared based on a preliminary design (VO+). Subsequently, the realisation partner may submit a tender; if approved, they will be awarded the contract for that phase. Some sub-processes may be awarded outside of the construction team.
Slibverwerkingsbedrijf Sluisjesdijk (SLDK) was commissioned in 1986. SLDK processes sludge produced by RWZI Dokhaven and three other RWZI's. The technical installations at Sluisjesdijk are approaching the end of their service life. WSHD is seeking a contractor for the realisation of the large-scale renovation of the Sluisjesdijk sludge treatment plant, hereinafter also referred to as 'Project Sluisjesdijk 2.0' or 'Project SLDK2.0'. Through the package of measures and investments, SLDK is to be made robust and future-proof again, utilizing realistic and pragmatic opportunities for sustainabilit
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the intended approach for the renovation of the Sluisjesdijk sludge treatment plant?
How is the continuity of business operations ensured during the works?
Which disciplines are the works within this project focused on?
Will the contract for all sub-processes be awarded to the realisation partner?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159