AwardedWorksOpen

Realization of Vischluststuw, Rowolderstuw and modification of Doolhofstuw Optimization De Onlanden

Waterschap Noorderzijlvest · Open · 1 lots · 372693
Type
Works
45000000
Estimated value
€ 4,13M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Two-phase assignment for the realization of weir structures in the Noorderzijlvest region. The tender has already been successfully awarded (status 'awarded') and includes both a construction team phase and a realization phase. The contracting authority is Waterschap Noorderzijlvest, under CPV code 45000000. The tender applies to public works and is not published via a digital or EU procurement. - **Contract structure**: 1. **Construction team phase** – Participation in the construction team with the aim of a feasible design and a final price offer. 2. **Realization phase** – Setting up and executing the structures for two flap weirs, expansion of an existing doolhofstuw, quay structures, and water protection. - **Timeline**: Publication 28-03-2025, deadline 09-05-2025. - **Alternative information**: No information is available regarding the valuation rate or additional documents. - **Implementation tips**: Create a clear schedule for the two phases, ensure clear communication with the construction team, and confirm price agreements before closing the realization agreement.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€4,130,000
awarded value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Two-phase assignment for the realization of weir structures in the Noorderzijlvest region. The tender has already been successfully awarded (status 'awarded') and includes both a construction team phase and a realization phase. The contracting authority is Waterschap Noorderzijlvest, under CPV code 45000000. The tender applies to public works and is not published via a digital or EU procurement. - **Contract structure**: 1. **Construction team phase** – Participation in the construction team with the aim of a feasible design and a final price offer. 2. **Realization phase** – Setting up and executing the structures for two flap weirs, expansion of an existing doolhofstuw, quay structures, and water protection. - **Timeline**: Publication 28-03-2025, deadline 09-05-2025. - **Alternative information**: No information is available regarding the valuation rate or additional documents. - **Implementation tips**: Create a clear schedule for the two phases, ensure clear communication with the construction team, and confirm price agreements before closing the realization agreement.

The assignment is structured as a 2-phase contract, consisting of a construction team agreement and a realization agreement. The assignment consists of (1) participating in the construction team to arrive at a feasible design or specification. The contractor in the construction team may exclusively submit a price offer for the result of the construction team. If the contracting authority and the contractor agree on the contractor's price offer, a (2) realization agreement can be concluded and, based on that, proceed to execution. Phase 1 works: UO-engineering of temporary auxiliary structures,

45000000Works
1Realization of Vischluststuw, Rowolderstuw and modification of Doolhofstuw Optimization De Onlanden

02Outcome

Awarded

Aannemersbedrijf Oosterhuis B.V.

Award value
€4,130,000
Bidders
4

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9969×
2KWS Infra B.V.SME9892×
3Van Hattum & Blankevoort N.V.SME9821×
4Dura Vermeer Infra Regionale Projecten BVSME9758×
5Arcadis Nederland B.V.SME97116×
6Sweco Nederland B.V. SME9771×

05Legal themes that may be relevant here

06Frequently asked questions

How is the contract structure of this assignment organized?
The assignment is structured as a two-phase contract. This consists of a construction team agreement to establish a feasible design and a subsequent realization agreement for the actual execution.
What are the activities during the construction team phase?
In the first phase, UO-engineering takes place for temporary auxiliary structures, formwork, support structures, railing systems, and weir gates. Additionally, work plans are drafted and a final price offer is made based on a recalibration.
Which activities are carried out in the realization phase?
The realization includes the construction of two flap weirs with rack and pinion, the installation of quays from the Hooiweg, the realization of bed and bank protection, and the extension of the gate of the existing doolhofstuw, including raising the surrounding quays.
In what way is the price offer for the execution determined?
The contractor participating in the construction team has the exclusive right to submit a price offer for the result of the construction team. Upon agreement between the contracting authority and the contractor regarding this price offer, a realization agreement can be concluded.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159