AwardedWorksEuropeanRestricted

Realization of the project replacement polder pumping station (PG) Hitland

Type
Works
45240000
Estimated value
€ 7,69M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Hoogheemraadschap van Schieland en de Krimpenerwaard intends to replace the outdated polder pumping station Hitland (1989). The new pumping station must be fish-friendly and two-way fish passable, with an inlet capacity of 15 m³/min and a discharge capacity of 70 m³/min. Additionally, the system must be easily expandable in the future by 25 m³/min for a connection between the Groot Hitland water level area and Middelwaard/Oostgaarde. The replacement is necessary due to insufficient reliability, capacity, and the bottleneck for fish migration, and complies with the Water Framework Directive (WFD). The contract is subject to a non-public procedure and concerns a works project.

Works · Restricted · European procedure

European
Contract type
Works
Restricted
Estimated value
€7,691,999
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Rotterdam
CharacteristicsCPV 45WorksEU tenderpolder pumping stationfish passableinlet capacity

01What is being requested

Hoogheemraadschap van Schieland en de Krimpenerwaard intends to replace the outdated polder pumping station Hitland (1989). The new pumping station must be fish-friendly and two-way fish passable, with an inlet capacity of 15 m³/min and a discharge capacity of 70 m³/min. Additionally, the system must be easily expandable in the future by 25 m³/min for a connection between the Groot Hitland water level area and Middelwaard/Oostgaarde. The replacement is necessary due to insufficient reliability, capacity, and the bottleneck for fish migration, and complies with the Water Framework Directive (WFD). The contract is subject to a non-public procedure and concerns a works project.

Pumping station Hitland (with 1 pump) dates from 1989 and requires replacement because its reliability and capacity are insufficient. Additionally, it has been established that pumping station Hitland is a bottleneck in the fish migration to and from the polders Esse, Gansdorp, and Blaardorp, and lacks an inlet facility from the Hollandsche IJssel. In accordance with the Water Framework Directive (WFD) list of measures, such a bottleneck must be resolved. The Hoogheemraadschap van Schieland en Krimpenerwaard intends to replace the polder pumping station Hitland with a fish-friendly and two-way

45240000Works
1Lot 1€1

02Outcome

Awarded

Van Hattum en Blankevoort B.V.

Award value
€7,691,999

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9658×
2Van Hattum & Blankevoort N.V.SME9619×
3ENGIE Infra & Mobility B.V.SME9569×
4Boskalis Nederland B.V.SME9570×
5Heijmans Infra B.V.SME9565×
6KWS Infra B.V.SME9492×

06Legal themes that may be relevant here

07Frequently asked questions

What is the technical necessity for the replacement of polder pumping station Hitland?
The replacement is necessary because the reliability and capacity of the current pumping station from 1989 are insufficient. Additionally, the pumping station forms a bottleneck for fish migration to and from the polders Esse, Gansdorp, and Blaardorp.
Which fish migration requirements must the new pumping station meet?
The new pumping station must be fish-friendly and two-way fish passable to resolve the bottlenecks in fish migration in accordance with the Water Framework Directive (WFD) list of measures.
What are the required capacities of the new pumping station?
The new pumping station must have an inlet capacity of 15 m³/min and a discharge capacity of 70 m³/min. Additionally, the system must be easily expandable in the future by 25 m³/min for the connection of the Groot Hitland water level area with the Middelwaard/Oostgaarde water level area.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 7,7 mln

Gegunde waarden in CPV 45 · werken n=3159