Realization of Public Transport Hub
This tender concerns the design and construction of a new public transport hub in Haarlem, including an underground bicycle storage facility and infrastructure adjustments. Selection takes place on the basis of technical competence and the final award is based on the best price-quality ratio.
Works · Restricted · European procedure
01What is being requested
Realization of a public transport hub in Haarlem consisting of an underground bicycle parking garage, redesign of the public space, infrastructure, a bus platform, and an underpass. The assignment includes the preparation of a Definitive and Execution Design and the subsequent realization under UAV-GC 2005.
Realizing a public transport hub (bus station) at the Schipholweg in Haarlem.
02Outcome
Van Hattum en Blankevoort B.V.
03Strategic insight
Ensure a very strong substantiation of the technical competence through the six specific core competencies. Pay extra attention to risk management and traffic flow in the plan of approach. Check whether the turnover requirement for the civil engineering sector is met for the entire consortium.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
Assessment of the effectiveness of the construction phasing, risk management, design of traffic measures for minimal nuisance, adaptability of measures, and the involvement of the contracting authority in aesthetic values.
Realizing as low an environmental impact as possible by using the Environmental Cost Indicator (MKI).
08Process & timeline
09Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
10Bidders in this segment
11Tender documents
12Legal themes that may be relevant here
13Frequently asked questions
What does the realization of the public transport hub at the Schipholweg include?
What is the capacity of the planned underground bicycle storage?
Which works fall under the technical execution of this project?
Automatically compiled from the official tender data and documents.
14Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159