Realization of new construction sewage pumping station Westwaard

Waterschap Brabantse Delta · Restricted · 1 lots · 377632
Type
Works
45232400
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
3 criteria
Assess manuallyconfidence high

The assignment concerns the realization of a new sewage pumping station in Kaatsheuvel with an estimated value of € 9 million. The award will be based on the most economically advantageous tender.

Works · Restricted · European procedure

EuropeanComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Realization of the new construction sewage pumping station Westwaard, including the relocation of the Sweensstraat sewage pumping station, replacement of sewage pipes, and a closed face boring. The expected duration is approximately 23 months.

The works include the relocation of the Sweensstraat sewage pumping station, the replacement of sewage pipes, the relocation of a sewage overflow, and the realization of a rainwater discharge under the Sweensstraat to the rural area. Part of the works will involve a closed face boring in a built-up area. The works are expected to take approximately 23 months. The existing sewage pumping station at Sweensstraat in Kaatsheuvel is outdated and must be replaced. The Westwaard residential development is taking place near the current location. The new sewage pumping station will be located to the

45232400Works
1Realization of new construction sewage pumping station Westwaard

02Outcome

Awarded

Aannemingsbedrijf G. van der Ven B.V.

Bidders
4

03Strategic insight

Strategic insight · AI analysis
Ensure a strong plan of approach for both design and realization. When applying, pay attention to the duplicate requirements in the dashboard to provide evidence efficiently. A 2-phase contract is accepted by the contracting authority as a form of an integrated contract.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 3
The works include a closed face boring in a built-up area.Important
For the application, uploading the UEA and required evidence may suffice.Important
Some requirements in the dashboard are duplicated and certain requirements have been discontinued.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

Plan of approach design and realization1

Assessment based on the most economically advantageous tender using the award on value methodology.

Project risks1

Assessment based on the most economically advantageous tender using the award on value methodology.

Price criterion1

Assessment based on the most economically advantageous tender using the award on value methodology.

07Process & timeline

Deadline for requests for additional information
21/05/2025 23:59 +02:00
Deadline for receipt of requests to participate
13/06/2025 13:00 +02:00
Estimated date of dispatch of invitations to tender
17/07/2025

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME10069×
2Heijmans Infra B.V.SME10065×
3KWS Infra B.V.SME9992×
4Combinatie Heijmans - SWARCOUnknown9973×
5Van Gelder BVSME9953×
6Dura Vermeer Infra Regionale Projecten BVSME9958×

10Tender documents

TN524524 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20260102111954pdfJan 4, 2026 · 143 KB
Nota van inlichtingen 2025-05-27-1pdfMay 27, 2025 · 6 KB
Nota van inlichtingen 2025-05-23-1pdfMay 23, 2025 · 5 KB
Nota van inlichtingen 2025-05-22-1pdfMay 22, 2025 · 3 KB
TN524524 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250522132704pdfMay 22, 2025 · 9 KB
Bijlage 3a - Extra Referentieformulieren kerncompententie 3a-bdocxMay 8, 2025 · 109 KB
Bijlage 5 - UEApdfMay 8, 2025 · 327 KB
Selectieleidraad Realisatie nieuwbouw rioolgemaal WestwaardpdfMay 8, 2025 · 434 KB
Bijlage 4- MarktconsultatiedocumentenzipMay 8, 2025 · 5245 KB
TN524524 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250506162035pdfMay 8, 2025 · 9 KB
Bijlage 3 - ReferentieformulierendocxMay 8, 2025 · 108 KB

11Legal themes that may be relevant here

12Frequently asked questions

What does the assignment for the realization of the Westwaard sewage pumping station entail?
The works include the relocation of the Sweensstraat sewage pumping station, the replacement of sewage pipes, the relocation of a sewage overflow, and the realization of a rainwater discharge under the Sweensstraat to the rural area. A closed face boring will take place in a built-up area.
What is the expected execution period for this assignment?
The works are expected to take approximately 23 months.
What is the reason for replacing the current sewage pumping station?
The existing sewage pumping station at Sweensstraat in Kaatsheuvel is outdated and must be replaced. The new sewage pumping station will be located to the west of the Westwaard residential development.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159