AwardedWorksEuropeanRestricted

Realization of IKC Borne-West

Stichting Brigantijn · Restricted · 1 lots · 312110
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Brigantijn intends to merge the two primary schools Jan Ligthart and ’t Oldhof into one new school within a childcare center. The current ’t Ridderspoortje building will be renovated and integrated into the newly to be constructed school building. The procurement concerns a non-public procedure for a works contract. The contractor must execute the technical design and specifications and realize the childcare center within the frameworks of quality, time, budget, and safety. The assignment requires an integrated construction and renovation solution, compliance with educational and safety standards, and an efficient construction process.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderschool constructionrenovationchildcare center

01What is being requested

Stichting Brigantijn intends to merge the two primary schools Jan Ligthart and ’t Oldhof into one new school within a childcare center. The current ’t Ridderspoortje building will be renovated and integrated into the newly to be constructed school building. The procurement concerns a non-public procedure for a works contract. The contractor must execute the technical design and specifications and realize the childcare center within the frameworks of quality, time, budget, and safety. The assignment requires an integrated construction and renovation solution, compliance with educational and safety standards, and an efficient construction process.

Both primary schools Jan Ligthart and ’t Oldhof require replacement. The current buildings no longer meet the technical and functional requirements of contemporary education and are at the end of their service life. In recent years, Stichting Brigantijn has had to invest heavily to keep both locations open. Therefore, Stichting Brigantijn wishes to merge both schools and house them as one (1) new school in a childcare center to be realized. The decision has been made to renovate the ’t Ridderspoortje building and integrate it into the newly to be constructed school building. Through this tende

45000000Works
1No lots - concerns one integral assignment.

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME9141×
2Hegeman Bouw & Infra B.V.SME9131×
3BINX Smartility B.V.SME9127×
4Kernbouw B.V.SME9112×
5Facilicom Solutions B.V.SME8717×
6Constructif B.V.SME8513×

05Legal themes that may be relevant here

06Frequently asked questions

What is the core of the assignment for the realization of the IKC Borne-West?
The assignment includes the realization of a new childcare center by merging the primary schools Jan Ligthart and ’t Oldhof. This will be realized by renovating the ’t Ridderspoortje building and integrating it into a newly to be constructed school building based on the Technical Design and Specifications.
Which frameworks apply to the execution of the realization?
The realization of the childcare center must take place within the established frameworks of quality, time, budget, and safety, aiming for a smooth and efficient construction process.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159