Realization of Wastewater Transport Pipeline Leimuiden (DIG-18368)
Realization of a new wastewater transport pipeline between Leimuiden and Nieuwe Wetering by means of various earthworks and pipeline works.
Works · Open · National procedure
01What is being requested
The contract concerns the realization of a wastewater transport pipeline from the current AWTG Leimuiden to the AWZI Nieuwe Wetering, including earthworks, pipeline installation in open excavation, pressure pipes, HDDs, and sinkers.
The existing AWZI Leimuiden will eventually be relocated, as a capacity expansion also took place during the renovation of AWZI Nieuwe Wetering a few years prior, allowing the latter to take over the purification activities of AWZI Leimuiden. To make this possible, among other things, the current AWTG's must be renovated or renewed and a new AWTL (ø315mm) must ensure the transport of wastewater to Nieuwe Wetering.
02Strategic insight
Ensure a very strong plan of approach as this is a quality aspect. Ensure that the tender price is correctly substantiated on the Tender Schedule Annex 3.
03Points of attention
04Award criteria
K1 Plan of approach
Display the tender slip and the substantiation on the Tender Schedule Annex 3
05Process & timeline
06Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
07Likely competitors
08Tender documents
09Legal themes that may be relevant here
10Frequently asked questions
What is the exact scope of the works for the new wastewater transport pipeline?
Which suitability criteria must a bidder meet?
What is the purpose of the realization of the new AWTL (ø315mm)?
Which technical requirements apply to the execution?
Automatically compiled from the official tender data and documents.
11Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159