Framework agreement for traffic measures on non-motorways
PWN Waterleidingbedrijf Noord-Holland intends to conclude two framework agreements for temporary traffic measures on non-motorways through an open procurement. Lot 1 focuses on traffic measures during failures and repairs of transport, distribution, and connection pipelines in areas 1, 2, and 3. Lot 2 covers traffic measures for projects and tasks on distribution and connection pipelines in area 3, with an optional extension to area 2B (option A) and areas 1 and 2A (option B). The contracting authority divides the assignment into two lots and expects a winning bidder per lot who can implement the traffic measures according to the specifications in the tender guidelines. The framework agreements provide a flexible, renewable basis for deploying traffic measures during various works.
Services · Open · European procedure · SME-friendly
01What is being requested
PWN Waterleidingbedrijf Noord-Holland intends to conclude two framework agreements for temporary traffic measures on non-motorways through an open procurement. Lot 1 focuses on traffic measures during failures and repairs of transport, distribution, and connection pipelines in areas 1, 2, and 3. Lot 2 covers traffic measures for projects and tasks on distribution and connection pipelines in area 3, with an optional extension to area 2B (option A) and areas 1 and 2A (option B). The contracting authority divides the assignment into two lots and expects a winning bidder per lot who can implement the traffic measures according to the specifications in the tender guidelines. The framework agreements provide a flexible, renewable basis for deploying traffic measures during various works.
The Contracting Authority divides the Assignment into two Lots: -Lot 1: temporary traffic measures during Failures and Repairs of transport, distribution, and connection pipelines in area 1, 2, and 3; -Lot 2: temporary traffic measures for Projects and Tasks on distribution and connection pipelines in area 3. More information regarding the division of the PWN supply area can be found in the Tender Guidelines. The objective of the Procurement is to conclude two Agreements for the application of temporary traffic measures: -one Framework Agreement with the winning Bidder of Lot 1 and -one Fr
02Breakdown by lot
Per-lot values not published — bars show only the lot breakdown.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
05Likely competitors
06Legal themes that may be relevant here
07Frequently asked questions
What is the content of Lot 1?
What is the content of Lot 2?
Are there options included in the framework agreement for Lot 2?
What is the purpose of this procurement?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 443K
€ 1,2 mln
€ 4,0 mln
Gegunde waarden in CPV 63 · diensten n=110